Agios Georgios
Download PDF data sheet
Agios Georgios under construction

Particulars
Owner: Terna Energiaki
Designer: Hydretme & Sofios Consulting Engineers S.A.
Contractor: TERNA Construction
Statistics
Type: Hardfill
Purpose(s): Hydropower
Reservoir capacity: 7 m3x106
Height: 59 metres
Length: 475 metres
Volume of RCC: 765 m3x103
Total volume: 795 m3x103
Construction Dates
Start of Project: 06/23 (June 2023)
Start of RCC: 04/24 (April 2024)
End of RCC: 10/25 (October 2025)
End of Project: 12/25 (December 2025)
Country: Greece
River: Kapnitsorrema
DMS Co-ordinates: 38˚54'01.1"N, 21˚26'56.9"E
DD Co-ordinates: 38.900307, 21.449139
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|