Alto Irani

Download PDF data sheet
Alto Irani completed
Alto Irani completed

Particulars

Owner: CPFL Renovaveis

Designer: MEK Engenharia, CESBE and SBB

Contractor: Aneel

Statistics

Type: Hardfill

Purpose(s): Hydropower

Reservoir capacity: 2 m3x106

Height: 44 metres

Length: 270 metres

Volume of RCC: 14 m3x103

Total volume: 20 m3x103

Construction Dates

Start of Project: /07 ( 2007)

Start of RCC: /07 ( 2007)

End of RCC: /08 ( 2008)

End of Project: /08 ( 2008)

Country: Brazil

River: Irani

DMS Co-ordinates: 26˚57'28.80"S, 52˚20'25.66"W

DD Co-ordinates: -26.958000, -52.340462