SEARCHING
... please wait

Amatisteros III

Download PDF data sheet
Photo coming soon

Particulars

Owner: Junta de Andalucia

Designer: Confederacion Hidrografica del Sur

Contractor: SACYR

Statistics

Type: Gravity

Purpose(s): Flood Control

Reservoir capacity: 1 m3x106

Height: 19 metres

Length: 75 metres

Volume of RCC: 4 m3x103

Total volume: 5 m3x103

Construction Dates

Start of Project: 09/91 (September 1991)

Start of RCC: 09/91 (September 1991)

End of RCC: 12/91 (December 1991)

End of Project: 12/91 (December 1991)

Country: Spain

River: Belén

DMS Co-ordinates: unknown

DD Co-ordinates: unknown

Facings

Upstream

SlopeType
0.05RCC against formwork

Downstream

SlopeType
0.75RCC against formwork  [stepped face]

Spillway

SlopeType
0.75RCC against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
73
Pozzolan (kg/m3)Pozzolan Type
109Low-lime flyash (ASTM Class F)