Carnaúba
Download PDF data sheet
Carnaúba completed

Statistics
Type: Gravity
Purpose(s): Irrigation / Water Supply
Reservoir capacity: 26 m3x106
Height: 19 metres
Length: 700 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/01 (— 2001)
Start of RCC: 02/02 (February 2002)
End of RCC: 11/02 (November 2002)
End of Project: —/03 (— 2003)
Country: Brazil
River: Quixeré
DMS Co-ordinates: 6˚37'44.81"S, 37˚8'54.17"W
DD Co-ordinates: -6.629114, -37.14838
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
| [stepped face] |
Spillway
| Slope | Type |
|---|---|
| [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |
