SEARCHING
... please wait

Çindere

Download PDF data sheet
Çindere completed
Çindere completed

Particulars

Owner: DSI - State Hydraulic Works

Designer: DSI - State Hydraulic Works

Contractor: Ozaltin Ins. Tic. ve San A.S.

Statistics

Type: Hardfill

Purpose(s): Hydropower / Irrigation / Water Supply

Reservoir capacity: 84 m3x106

Height: 107 metres

Length: 280 metres

Volume of RCC: 1500 m3x103

Total volume: 1685 m3x103

Construction Dates

Start of Project: 04/94 (April 1994)

Start of RCC: 07/02 (July 2002)

End of RCC: 05/05 (May 2005)

End of Project: 11/07 (November 2007)

Country: Turkey

River: Buyuk Menderes

DMS Co-ordinates: 38˚6'57.15"N, 29˚2'5.19"E

DD Co-ordinates: 38.115875, 29.034775

Facings

Upstream

SlopeType
0.70Traditional concrete against precast concrete panels with geomembrane

Downstream

SlopeType
0.70RCC against formwork

Spillway

SlopeType
0.89Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
50
Pozzolan (kg/m3)Pozzolan Type
20Low-lime flyash (ASTM Class F)