Contraembalse de Moncion

Download PDF data sheet
Contraembalse de Moncion completed
Contraembalse de Moncion completed

Particulars

Owner: INDRHI (Instiuto Nacional de Recursos Hidráulicos de la República Dominicana)

Designer: Integral S.A

Contractor: Consorcio Agromán-Conde-Unión Fenosa

Statistics

Type: Hardfill

Purpose(s): Flood Control / Hydropower / Irrigation

Reservoir capacity: 8 m3x106

Height: 20 metres

Length: 254 metres

Volume of RCC: 130 m3x103

Total volume: 155 m3x103

Construction Dates

Start of Project: 07/95 (July 1995)

Start of RCC: 02/96 (February 1996)

End of RCC: 03/98 (March 1998)

End of Project: 06/98 (June 1998)

Country: Dominican Republic

River: Mao

DMS Co-ordinates: 19˚27'58.35"N, 71˚04'48.39"W

DD Co-ordinates: 19.466208, -71.080109

Facings

Upstream

SlopeType
0.70Traditional concrete against formwork

Downstream

SlopeType
0.67Traditional concrete against formwork  [stepped face]

Spillway

SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -