SEARCHING
... please wait

Enciso

Download PDF data sheet
Enciso under construction
Enciso under construction

Particulars

Owner: Confederación Hidrográfica del Ebro, Ministerio de Agricultura Alimentación y Medio Ambiente

Designer: Confederación Hidrográfica del Ebro

Contractor: Dragados S.A./FCC J.V

Statistics

Type: Gravity

Purpose(s): Irrigation / Water Supply

Reservoir capacity: 47 m3x106

Height: 103 metres

Length: 376 metres

Volume of RCC: 690 m3x103

Total volume: 718 m3x103

Construction Dates

Start of Project: /08 ( 2008)

Start of RCC: 08/14 (August 2014)

End of RCC: 11/16 (November 2016)

End of Project: 12/16 (December 2016)

Country: Spain

River: Cidacos

DMS Co-ordinates: 42˚08'40.66"N, 02˚16'39.21"W

DD Co-ordinates: 42.144627, -2.277558

Facings

Upstream

SlopeType
VerticalTraditional concrete against formwork

Downstream

SlopeType
0.80Traditional concrete against formwork  [stepped face]

Spillway

SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
140Low-lime flyash (ASTM Class F)