Maojiahe
Download PDF data sheet
Maojiahe completed

Particulars
Owner: China Power Investment Corporation
Designer: Hydrochina Guiyang Engineering Corporation
Contractor: 3rd Construction Bureau
Statistics
Type: Thin Arch
Purpose(s): Hydropower
Reservoir capacity: 13 m3x106
Height: 75 metres
Length: 166 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/14 (— 2014)
Start of RCC: —/16 (— 2016)
End of RCC: —/18 (— 2018)
End of Project: —/19 (— 2019)
Country: China
River: Qingshuihe
DMS Co-ordinates: 26˚20'40.88"N, 104˚39'26.67"E
DD Co-ordinates: 26.344688, 104.65741
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|