SEARCHING
... please wait

Mikasabonbetsu

Download PDF data sheet
Photo coming soon

Particulars

Owner: Ministry of Land, Infrastructure, Transport and Tourism

Designer: Ministry of Land, Infrastructure, Transport and Tourism

Contractor: unknown

Statistics

Type: Hardfill

Purpose(s): Flood Control

Reservoir capacity: 9 m3x106

Height: 53 metres

Length: 160 metres

Volume of RCC: unknown

Total volume: 180 m3x103

Construction Dates

Start of Project: /85 ( 1985)

Start of RCC: /22 ( 2022)

End of RCC: /24 ( 2024)

End of Project: /26 ( 2026)

Country: Japan

River: Honbetsu

DMS Co-ordinates: 43˚16'39.15"N, 141˚59'7.57"E

DD Co-ordinates: 43.277542, 141.985443

Facings

Upstream

SlopeType
0.80Traditional concrete against formwork

Downstream

SlopeType
0.80Traditional concrete against formwork

Spillway

SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type