Moínho

Download PDF data sheet
Moínho under construction
Moínho under construction

Particulars

Owner: Moinho S.A.

Designer: unknown

Contractor: unknown

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 1 m3x106

Height: 22 metres

Length: unknown

Volume of RCC: 9 m3x103

Total volume: 25 m3x103

Construction Dates

Start of Project: /09 ( 2009)

Start of RCC: /10 ( 2010)

End of RCC: /11 ( 2011)

End of Project: /11 ( 2011)

Country: Brazil

River: Bernado Jose

DMS Co-ordinates: 27˚45'20.28"S, 51˚20'3.18"W

DD Co-ordinates: -27.755632, -51.334217

Facings

Upstream

SlopeType
  

Downstream

SlopeType
  

Spillway

SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
68
Pozzolan (kg/m3)Pozzolan Type
17