SEARCHING
... please wait

Okshtuni

Download PDF data sheet
Okshtuni under construction
Okshtuni under construction

Particulars

Owner: Diteko Ltd.

Designer: unknown

Contractor: unknown

Statistics

Type: unknown

Purpose(s): Hydropower

Reservoir capacity: 10 m3x106

Height: 65 metres

Length: 253 metres

Volume of RCC: 16 m3x103

Total volume: 2 m3x103

Construction Dates

Start of Project: /2014 ( 2014)

Start of RCC: /2016 ( 2016)

End of RCC: /2017 ( 2017)

End of Project: /2018 ( 2018)

Country: Albania

River: Okshtuni

DMS Co-ordinates: unknown

DD Co-ordinates: unknown

Facings

Upstream

SlopeType
VerticalReinforced conventional concrete cast after RCC placement
0.15 

Downstream

SlopeType
0.90Reinforced conventional concrete cast after RCC placement  [stepped face]

Spillway

SlopeType
0.90Reinforced conventional concrete cast after RCC placement  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
115
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -