Particulars

Owner: Secretaria de Desarrollo Urbano Y Obras Publicas, Gobierno Del Estado de Nuevo Leon

Designer: Instituto de Ingeniera de la Universidad Autonoma de Nuevo Leon

Contractor: DYCUSA

Statistics

Type: Gravity

Purpose(s): Flood Control

Reservoir capacity: 100 m3x106

Height: 109 metres

Length: 250 metres

Volume of RCC: 380 m3x103

Total volume: 400 m3x103

Construction Dates

Start of Project: /02 ( 2002)

Start of RCC: 03/03 (March 2003)

End of RCC: /03 ( 2003)

End of Project: /04 ( 2004)

Country: Mexico

River: Santa Catarina

DMS Co-ordinates: 25˚33'23.63"N, 100˚23'52.56"W

DD Co-ordinates: 25.556564, -100.397934

Facings

Upstream

SlopeType
VerticalRCC against precast concrete panels with geomembrane

Downstream

SlopeType
VerticalTraditional concrete against precast concrete panels
0.85Unformed face of RCC  [stepped face]

Spillway

SlopeType
0.85Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
65
Pozzolan (kg/m3)Pozzolan Type
35Low-lime flyash (ASTM Class F)