Sehuencas (formerly Ivirizu)
Download PDF data sheet
Sehuencas (formerly Ivirizu) under construction

Particulars
Owner: ENDE Valle Hermoso S.A.
Designer: unknown
Contractor: SinoHydro Co. Ltd. (**th Construction Bureau)
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 30 m3x106
Height: 125 metres
Length: 350 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/18 (— 2018)
Start of RCC: —/21 (— 2021)
End of RCC: —/23 (— 2023)
End of Project: —/24 (— 2024)
Country: Bolivia
River: Ivirizu
DMS Co-ordinates: 17˚28'14.10"S, 65˚16'45.37"W
DD Co-ordinates: -17.470583, -65.279266
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
