Tanger-Med (formerly R’Mel)

Download PDF data sheet
Tanger-Med (formerly R’Mel) completed
Tanger-Med (formerly R’Mel) completed

Particulars

Owner: Direction des Aménagements Hydrauliques

Designer: NOVEC (Ingema)

Contractor: SGTM

Statistics

Type: Gravity

Purpose(s): Flood Control / Water Supply

Reservoir capacity: 25 m3x106

Height: 80 metres

Length: 250 metres

Volume of RCC: 230 m3x103

Total volume: 243 m3x103

Construction Dates

Start of Project: 05/05 (May 2005)

Start of RCC: 06/06 (June 2006)

End of RCC: 06/07 (June 2007)

End of Project: 10/07 (October 2007)

Country: Morocco

River: R’Mel

DMS Co-ordinates: 35˚52'32.55"N, 5˚29'4.7"W

DD Co-ordinates: 35.87571, -5.484639

Facings

Upstream

SlopeType
VerticalReinforced conventional concrete cast before RCC placement

Downstream

SlopeType
0.75Traditional concrete against formwork  [stepped face]

Spillway

SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
100
90
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
0