SEARCHING
... please wait

Zaoshi

Download PDF data sheet
Zaoshi completed
Zaoshi completed

Particulars

Owner: Lishui Basin Hydraulic and Hydroelectric Development Corporation

Designer: Insitute of Investigation and Design, Commission of Water Resources, Changjiang

Contractor: Liaoning Construction Bureau

Statistics

Type: Gravity

Purpose(s): Flood Control / Hydropower / Navigation / Water Supply

Reservoir capacity: 1439 m3x106

Height: 88 metres

Length: 351 metres

Volume of RCC: 450 m3x103

Total volume: 930 m3x103

Construction Dates

Start of Project: /04 ( 2004)

Start of RCC: /05 ( 2005)

End of RCC: /06 ( 2006)

End of Project: /07 ( 2007)

Country: China

River: Dieshui

DMS Co-ordinates: unknown

DD Co-ordinates: unknown

Facings

Upstream

SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
0.25 

Downstream

SlopeType
0.80RCC against formwork (GEVR/GE-RCC)

Spillway

SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
53
83
Pozzolan (kg/m3)Pozzolan Type
99Low-lime flyash (ASTM Class F)
102