Particulars

Owner: Federal Ministry of Power, Nigeria

Designer: EPC

Contractor: SinoHydro Corporation, CNEEC (China National Electrical Engineering Corporation) Consortium

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 10 m3x106

Height: 90 metres

Length: 1040 metres

Volume of RCC: 1850 m3x103

Total volume: unknown

Construction Dates

Start of Project: 09/13 (September 2013)

Start of RCC: /16 ( 2016)

End of RCC: /17 ( 2017)

End of Project: 07/18 (July 2018)

Country: Nigeria

River: Kaduna

DMS Co-ordinates: 09˚51'16"N, 06˚26'14"E

DD Co-ordinates: 9.854444, 6.437222

Facings

Upstream

SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)

Downstream

SlopeType
0.75RCC against formwork (GEVR/GE-RCC)  [stepped face]

Spillway

SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
77
84  100
Pozzolan (kg/m3)Pozzolan Type
33Low-lime flyash (ASTM Class F)
36  46