Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Derivação do Rio JordãoBrazilCopel Geração e Transmissão S.A.HJordão11005/9401/9503/9612/9773560576665           
TokerEritreaGovernment of EritreaWToker1411/9602/9805/9908/9973263187210V(1)0.80(1)*0.80(12)*33033011085(F)
ZhouningChinaMindong Electromechanical Development CorporationHMuyangxi47- /0204/0303/0406/0473206159199V(3')0.72(3')0.70(12)30030067
50
100
92
(F)
ZhoubaChinaChengdu Haineng Power Co. Ltd.F HMabianhe204- /04- /05- /06- /0773163229405V(1)0.70(1)0.78(1)300300110
66
73
66
(F)
Kirazlı KöprüTurkeyDSI - State Hydraulic WorksH IGökırmak66- /99- /13- /16- /1773280330 0.10(1)0.90(1)  300 7550(F)
Los Pilares (Bicentennial)MexicoCNA (Comisión Nacional del Agua)F I WMayo47802/14- /16- /1908/2073232600       300300   
HiraseJapanF H WNishiki30- /10- /16- /23- /2473300 340           
InandikTurkeyDSI - State Hydraulic WorksIInandik3104/18- /20- /23- /2473343271 0.15(1)0.80(1)  300 8080 
Tang e Mashooreh
[A]
IranLorestan Water AuthorityF I WKarkheh55- /13- /22- /25- /2673220             
Mohammed V Dam RaiseMoroccoMinistère de l'Equipement, des Transports, de la Logistique et de l'EauI WMoulouya980- /22- /24- /25- /2673              

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Brazil

Owner: Copel Geração e Transmissão S.A.

Type: Gravity

Purpose(s): Hydropower

River: Jordão

Reservoir capacity: 110 m3x106

Construction Dates

Start of Project: 05/94

Start of RCC: 05/94

End of RCC: 03/96

End of Project: 12/97

Specifications

Height: 73 metres

Length: 560 metres

Volume of RCC: 576 m3x103

Total volume: 665 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Derivação do Rio Jordão completed
Derivação do Rio Jordão completed

Full Dam Information

Details

Country: Eritrea

Owner: Government of Eritrea

Type: Gravity

Purpose(s): Water Supply

River: Toker

Reservoir capacity: 14 m3x106

Construction Dates

Start of Project: 11/96

Start of RCC: 11/96

End of RCC: 05/99

End of Project: 08/99

Specifications

Height: 73 metres

Length: 263 metres

Volume of RCC: 187 m3x103

Total volume: 210 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement  [stepped face]

Placement

Layers (mm)Lifts (mm)
330330

Cementitious material

Cement (kg/m3)
110
Pozzolan (kg/m3)Pozzolan Type
85Low-lime flyash (ASTM Class F)
  
Toker completed
Toker completed

Full Dam Information

Details

Country: China

Owner: Mindong Electromechanical Development Corporation

Type: Gravity

Purpose(s): Hydropower

River: Muyangxi

Reservoir capacity: 47 m3x106

Construction Dates

Start of Project: -/02

Start of RCC: -/02

End of RCC: 03/04

End of Project: 06/04

Specifications

Height: 73 metres

Length: 206 metres

Volume of RCC: 159 m3x103

Total volume: 199 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.72RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.70Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
67
50
Pozzolan (kg/m3)Pozzolan Type
100Low-lime flyash (ASTM Class F)
92 
Zhouning completed
Zhouning completed

Full Dam Information

Details

Country: China

Owner: Chengdu Haineng Power Co. Ltd.

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Mabianhe

Reservoir capacity: 204 m3x106

Construction Dates

Start of Project: -/04

Start of RCC: -/04

End of RCC: -/06

End of Project: -/07

Specifications

Height: 73 metres

Length: 163 metres

Volume of RCC: 229 m3x103

Total volume: 405 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.70Traditional concrete against formwork
Spillway
SlopeType
0.78Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
110
66
Pozzolan (kg/m3)Pozzolan Type
73Low-lime flyash (ASTM Class F)
66 
Zhouba completed
Zhouba completed

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Gökırmak

Reservoir capacity: 66 m3x106

Construction Dates

Start of Project: -/99

Start of RCC: -/99

End of RCC: -/16

End of Project: -/17

Specifications

Height: 73 metres

Length: 280 metres

Volume of RCC: 330 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.90Traditional concrete against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300 

Cementitious material

Cement (kg/m3)
75
Pozzolan (kg/m3)Pozzolan Type
50Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Mexico

Owner: CNA (Comisión Nacional del Agua)

Type: Gravity

Purpose(s): Flood Control / Irrigation / Water Supply

River: Mayo

Reservoir capacity: 478 m3x106

Construction Dates

Start of Project: 02/14

Start of RCC: 02/14

End of RCC: -/19

End of Project: 08/20

Specifications

Height: 73 metres

Length: 232 metres

Volume of RCC: 600 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Los Pilares (Bicentennial) under construction
Los Pilares (Bicentennial) under construction

Full Dam Information

Details

Country: Japan

Owner: -

Type: Gravity

Purpose(s): Flood Control / Hydropower / Water Supply

River: Nishiki

Reservoir capacity: 30 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/23

End of Project: -/24

Specifications

Height: 73 metres

Length: 300 metres

Volume of RCC: -

Total volume: 340 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Hirase completed
Hirase completed

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Gravity

Purpose(s): Irrigation

River: Inandik

Reservoir capacity: 31 m3x106

Construction Dates

Start of Project: 04/18

Start of RCC: 04/18

End of RCC: -/23

End of Project: -/24

Specifications

Height: 73 metres

Length: 343 metres

Volume of RCC: 271 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.15Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300 

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
80 
  
Photo coming soon

Full Dam Information

Details

Country: Iran

Owner: Lorestan Water Authority

Type: Thin Arch

Purpose(s): Flood Control / Irrigation / Water Supply

River: Karkheh

Reservoir capacity: 55 m3x106

Construction Dates

Start of Project: -/13

Start of RCC: -/13

End of RCC: -/25

End of Project: -/26

Specifications

Height: 73 metres

Length: 220 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Tang e Mashooreh on Google Earth
Tang e Mashooreh on Google Earth

Full Dam Information

Details

Country: Morocco

Owner: Ministère de l'Equipement, des Transports, de la Logistique et de l'Eau

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Moulouya

Reservoir capacity: 980 m3x106

Construction Dates

Start of Project: -/22

Start of RCC: -/22

End of RCC: -/25

End of Project: -/26

Specifications

Height: 73 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates