Dam Search Results
- Dimensions
- Height: 73 metres
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
| Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
| Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
| Derivação do Rio Jordão | Brazil | Copel Geração e Transmissão S.A. | H | Jordão | 110 | 05/94 | 01/95 | 03/96 | 12/97 | 73 | 560 | 576 | 665 | |||||||||||
| Toker | Eritrea | Government of Eritrea | W | Toker | 14 | 11/96 | 02/98 | 05/99 | 08/99 | 73 | 263 | 187 | 210 | V | (1) | 0.80 | (1)* | 0.80 | (12)* | 330 | 330 | 110 | 85 | (F) |
| Zhouning | China | Mindong Electromechanical Development Corporation | H | Muyangxi | 47 | - /02 | 04/03 | 03/04 | 06/04 | 73 | 206 | 159 | 199 | V | (3') | 0.72 | (3') | 0.70 | (12) | 300 | 300 | 67 50 | 100 92 | (F) |
| Zhouba | China | Chengdu Haineng Power Co. Ltd. | F H | Mabianhe | 204 | - /04 | - /05 | - /06 | - /07 | 73 | 163 | 229 | 405 | V | (1) | 0.70 | (1) | 0.78 | (1) | 300 | 300 | 110 66 | 73 66 | (F) |
| Kirazlı Köprü | Turkey | DSI - State Hydraulic Works | H I | Gökırmak | 66 | - /99 | - /13 | - /16 | - /17 | 73 | 280 | 330 | 0.10 | (1) | 0.90 | (1) | 300 | 75 | 50 | (F) | ||||
| Los Pilares (Bicentennial) | Mexico | CNA (Comisión Nacional del Agua) | F I W | Mayo | 478 | 02/14 | - /16 | - /19 | 08/20 | 73 | 232 | 600 | 300 | 300 | ||||||||||
| Hirase | Japan | F H W | Nishiki | 30 | - /10 | - /16 | - /23 | - /24 | 73 | 300 | 340 | |||||||||||||
| Inandik | Turkey | DSI - State Hydraulic Works | I | Inandik | 31 | 04/18 | - /20 | - /23 | - /24 | 73 | 343 | 271 | 0.15 | (1) | 0.80 | (1) | 300 | 80 | 80 | |||||
| Tang e Mashooreh [A] | Iran | Lorestan Water Authority | F I W | Karkheh | 55 | - /13 | - /22 | - /25 | - /26 | 73 | 220 | |||||||||||||
| Mohammed V Dam Raise | Morocco | Ministère de l'Equipement, des Transports, de la Logistique et de l'Eau | I W | Moulouya | 980 | - /22 | - /24 | - /25 | - /26 | 73 | ||||||||||||||
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Brazil
Owner: Copel Geração e Transmissão S.A.
Type: Gravity
Purpose(s): Hydropower
River: Jordão
Reservoir capacity: 110 m3x106
Construction Dates
Start of Project: 05/94
Start of RCC: 05/94
End of RCC: 03/96
End of Project: 12/97
Specifications
Height: 73 metres
Length: 560 metres
Volume of RCC: 576 m3x103
Total volume: 665 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Eritrea
Owner: Government of Eritrea
Type: Gravity
Purpose(s): Water Supply
River: Toker
Reservoir capacity: 14 m3x106
Construction Dates
Start of Project: 11/96
Start of RCC: 11/96
End of RCC: 05/99
End of Project: 08/99
Specifications
Height: 73 metres
Length: 263 metres
Volume of RCC: 187 m3x103
Total volume: 210 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 330 | 330 |
Cementitious material
| Cement (kg/m3) |
|---|
| 110 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 85 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Mindong Electromechanical Development Corporation
Type: Gravity
Purpose(s): Hydropower
River: Muyangxi
Reservoir capacity: 47 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: 03/04
End of Project: 06/04
Specifications
Height: 73 metres
Length: 206 metres
Volume of RCC: 159 m3x103
Total volume: 199 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.72 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 67 |
| 50 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Low-lime flyash (ASTM Class F) |
| 92 |

Details
Country: China
Owner: Chengdu Haineng Power Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Mabianhe
Reservoir capacity: 204 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 73 metres
Length: 163 metres
Volume of RCC: 229 m3x103
Total volume: 405 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 110 |
| 66 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 73 | Low-lime flyash (ASTM Class F) |
| 66 |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Gökırmak
Reservoir capacity: 66 m3x106
Construction Dates
Start of Project: -/99
Start of RCC: -/99
End of RCC: -/16
End of Project: -/17
Specifications
Height: 73 metres
Length: 280 metres
Volume of RCC: 330 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.90 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 75 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 50 | Low-lime flyash (ASTM Class F) |

Details
Country: Mexico
Owner: CNA (Comisión Nacional del Agua)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Mayo
Reservoir capacity: 478 m3x106
Construction Dates
Start of Project: 02/14
Start of RCC: 02/14
End of RCC: -/19
End of Project: 08/20
Specifications
Height: 73 metres
Length: 232 metres
Volume of RCC: 600 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Nishiki
Reservoir capacity: 30 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/23
End of Project: -/24
Specifications
Height: 73 metres
Length: 300 metres
Volume of RCC: -
Total volume: 340 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Inandik
Reservoir capacity: 31 m3x106
Construction Dates
Start of Project: 04/18
Start of RCC: 04/18
End of RCC: -/23
End of Project: -/24
Specifications
Height: 73 metres
Length: 343 metres
Volume of RCC: 271 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.15 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 80 | |

Details
Country: Iran
Owner: Lorestan Water Authority
Type: Thin Arch
Purpose(s): Flood Control / Irrigation / Water Supply
River: Karkheh
Reservoir capacity: 55 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/25
End of Project: -/26
Specifications
Height: 73 metres
Length: 220 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Ministère de l'Equipement, des Transports, de la Logistique et de l'Eau
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Moulouya
Reservoir capacity: 980 m3x106
Construction Dates
Start of Project: -/22
Start of RCC: -/22
End of RCC: -/25
End of Project: -/26
Specifications
Height: 73 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates