| Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
| Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
| Suçati | Turkey | ERE Electricity Co. | H | Güredin Creek | 9 | 01/98 | 02/99 | 10/99 | 10/99 | 36 | 192 | 55 | 60 | V | (7) | 0.80 | (7) | 0.80 | (12) | 300 | 300 | 50 | 100 | (S) |
| Çindere [H-F] | Turkey | DSI - State Hydraulic Works | H I W | Buyuk Menderes | 82 | 04/94 | 07/02 | 05/05 | 11/07 | 107 | 280 | 1500 | 1685 | 0.70 | (6) | 0.70 | (1)* | 0.89 | (12) | 300 | 300 | 50 | 20 | (F) |
| Akköy I | Turkey | Akköy Energy A.S. | H | Harsit | 3 | 07/05 | 10/06 | 04/07 | 09/08 | 38 | 144 | 87 | 101 | 0.10 | (1) | 0.80 | (1) | 0.80 | (12) | 300 | 300 | 100 | 100 | (N) |
| Beydag [H-F] | Turkey | DSI - State Hydraulic Works | I W | Kucuk Menderes | 248 | 04/94 | 07/06 | 04/08 | 11/08 | 95 | 800 | 2350 | 2650 | 0.25 | (6) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 60 | 30 | (F) |
| Feke II | Turkey | Akkur Energy Production Trade and Industry Co. Inc. | H | Göksu | 63 | 12/07 | 12/08 | 02/10 | 08/10 | 70 | 256 | 194 | 227 | 0.07 | (6) | 0.80 | (3')* | separate | 300 | 300 | 60 60 | 60 50 | (F) | |
| Adnan Mendres (formerly Çine) | Turkey | DSI - State Hydraulic Works | F H I W | Çine | 350 | 12/95 | 11/04 | 04/10 | 10/11 | 137 | 300 | 1560 | 1650 | 0.10 0.20 | (7') | 0.85 | (7') | 0.85 | (7') | 300 | 300 | 85 75 | 105 95 | (F) |
| Şirnak | Turkey | DSI - State Hydraulic Works | H | Ortasui | 18 | - /08 | 11/09 | 08/10 | 09/10 | 67 | 198 | 157 | 231 | 0.10 | (1) | 0.80 | (1)* | 0.80 | (12) | 300 | 600 | 125 | 0 | (-) |
| Çamlica III [H-F] | Turkey | Akfen Energy | F H | Zamanti | 1 | 04/08 | 04/10 | 12/10 | 04/11 | 52 | 186 | 160 | 182 | 0.70 | (7) | 0.70 | (1)* | 0.70 | (12) | 300 | 300 | 88 | 37 | (F) |
| Çaltikoru [H-F] | Turkey | DSI - State Hydraulic Works | I | İlyasdere | 42 | - /95 | - /08 | - /10 | 12/11 | 65 | 477 | 743 | 800 | 0.35 | (3') | 0.70 | (3')* | 0.70 | (12) | 300 | 300 | 60 | 50 | (F) |
| Güllübag | Turkey | Senerji Enerji | H | Çoruh | 21 | 05/09 | 02/11 | 06/11 | 02/12 | 72 | 97 | 160 | 175 | V | (1) | 0.50 0.70 | (1) (1) | 0.70 | (12) | 300 | 300 | 70 | 70 | (F) |
| Menge | Turkey | Enerjisa En. Ut. A.S. | H | Göksu | 51 | 05/09 | 08/10 | 10/11 | 12/11 | 68 | 304 | 349 | 384 | 0.25 | (1) | 0.80 | (3')* | 0.80 | (12) | 300 | 300 | 80 | 40 | (F) |
| Sefaköy | Turkey | Püre Energy Üretim Tic. A.S. | H | Aras | 21 | - /08 | - /10 | - /11 | 10/11 | 55 | 148 | 120 | (1) | (1) | ||||||||||
| Silopi | Turkey | DSI - State Hydraulic Works | H W | Hezil | 29 | 08/08 | - /10 | - /11 | 02/12 | 89 | 356 | 718 | 752 | 0.10 | (7) | 0.70 | (3')* | 0.70 | (1) | 300 | 300 | 81 | 39 | (-) |
| Balkusan | Turkey | Karen Energy | H | Balkusan | 15 | - /09 | - /10 | - /11 | - /12 | 48 | 189 | 60 | 76 | V | (1) | 0.75 | (1)* | 0.75 | (12) | 300 | 1200 | 75 | 50 | |
| Köprü | Turkey | Enerjisa En. Ut. A.S. | H | Göksu | 98 | 07/09 | 12/10 | 04/12 | - /13 | 109 | 413 | 975 | 1050 | V 0.60 | (1) (1) | 0.80 | (1) | 0.80 | (12) | 300 | 300 | 85 | 45 | (F) |
| Gökkaya | Turkey | MEM Enerji Elektrik Üretim Sanayi ve Ticaret A.Ş | H | Göksu | 18 | 02/10 | 07/10 | 05/12 | 07/12 | 69 | 118 | 96 | 122 | 0.067 | (1) | 0.80 | (1) | 0.80 | (11) | 300 | 300 | 55 | 55 | (F) |
| Devecikonagi | Turkey | MCK Elektrik Uretim A.S. | H I | Emet | 6 | 05/10 | 03/11 | 09/12 | 01/13 | 39 | 313 | 180 | 210 | 0.10 | (2) | 0.75 | (1) | 0.80 | (12) | 300 | 300 | 80 | 40 | (F) |
| Akköy II (Aladereçam) | Turkey | Akköy Energy A.S. | H | Karaovacik | 14 | - /07 | 05/11 | 09/12 | - /13 | 60 | 260 | 226 | 306 | V | (1) | 0.80 | (1) | 0.80 | (12) | 300 | 300 | 85 | 85 | (N) |
| Çermikler [H-F] | Turkey | DSI - State Hydraulic Works | H | Kizilirmak | 41 | - /08 | - /11 | - /12 | - /13 | 42 | 251 | 160 | ||||||||||||
| Çetintepe | Turkey | DSI - State Hydraulic Works | H | Robozik | 44 | 09/08 | - /11 | - /12 | - /13 | 39 | 173 | 60 | 64 | 0.10 | (1) | 0.80 | (1)* | 0.80 | (12) | 300 | 1200 | 77 | 63 | (N) |
| Naras | Turkey | DSI - State Hydraulic Works | F I | Manavgat | 104 | - /10 | 12/12 | 01/14 | 05/14 | 78 | 448 | 620 | 677 | 0.15 | (1) | 0.80 | (1)* | 0.80 | (12) | 300 | 300 | 110 | 90 | (N) |
| Aslandag | Turkey | DSI - State Hydraulic Works | H I W | Bembo | 11 | 09/08 | 11/11 | 02/14 | 11/14 | 69 | 210 | 162 | 202 | 0.10 | (1) | 0.80 | (1)* | 0.80 | (12) | 300 | 1200 | 100 | 80 | (N) |
| Beyhan-I [H-F] | Turkey | Kalehan Energy Üretim ve Ticaret A.S. | H | Murat | 369 | - /09 | 03/12 | 03/14 | 03/15 | 97 | 361 | 1480 | 1661 | 0.70 | (7) | 0.70 | (3') | 300 | 300 | 90 | 40 | (M) | ||
| Pembelik [H-F] | Turkey | Darenhes A.S. | H | PeriSuyu | 358 | 11/10 | 03/13 | 10/14 | - /15 | 88 | 500 | 760 | 838 | 0.70 | (3')* | 0.70 | (3')* | 0.70 | (12) | 300 | 1200 | 120 | 0 | (-) |
| Yalnızardıç | Turkey | Akköy Energy A.S. | H | Gevne | 109 | - /09 | - /11 | - /14 | - /15 | 113 | 300 | 490 | ||||||||||||
| Kayabeyi | Turkey | Pelin Energy | H I | Kura | 148 | 01/10 | - /12 | - /14 | 02/15 | 159 | 230 | 637 | 780 | 300 | ||||||||||
| Mamak | Turkey | DSI - State Hydraulic Works | F | Bağ | 1 | - /13 | - /13 | - /14 | - /14 | 31 | 118 | 30 | ||||||||||||
| Gümüsören [H-F] | Turkey | DSI - State Hydraulic Works | H I W | Zamanti | 195 | - /11 | - /13 | - /14 | 06/15 | 37 | 842 | 1890 | 1943 | 0.70 | (3') | 0.76 | (3')* | 0.76 | (12) | 300 | 1200 | 84 | 36 | (F) |
| Oguzlar | Turkey | DSI - State Hydraulic Works | H | Ortasu | 20 | 09/08 | - /13 | - /14 | - /15 | 53 | 431 | 392 | 460 | 0.10 | (1) | 0.80 | (1)* | 0.80 | (12) | 300 | 600 | 100 | 0 | (-) |
| Musatepe | Turkey | DSI - State Hydraulic Works | H | Robozik | 13 | 09/08 | - /13 | - /14 | - /15 | 66 | 165 | 131 | 138 | 0.10 | (1) | 0.80 | (3')* | 0.80 | (12) | 300 | 1200 | 77 | 63 | (N) |
| Karakuz | Turkey | Derin Enerji Uretim San. Ve Tic. A.S. | H | Kökün | 5 | - /12 | - /13 | - /14 | - /15 | 45 | 162 | 400 | ||||||||||||
| Adigüzel II | Turkey | Peker Energy Inc | H | Büyük Menderes | 15 | - /12 | - /13 | - /14 | - /15 | 61 | 145 | 150 | ||||||||||||
| Ayvali | Turkey | Ozdogan Enerji | H | Oltu | 308 | 04/11 | 02/13 | 02/15 | 10/15 | 177 | 405 | 1650 | 1900 | V | (3') | 0.75 | (3')* | 0.75 | (12) | 300 | 300 | 50 100 | 110 120 | (F) |
| Göktas 1 [H-F] | Turkey | Bereket Energy | H | Zamanti | 109 | 04/11 | 03/13 | 03/15 | - /16 | 133 | 200 | 749 | 900 | 0.30 1.00 | (1) (1) | 0.60 1.00 | (1) (1)* | 0.75 | (12) | 300 | 300 | 50 | 50 | (F) |
| Kotanli II [A-G] | Turkey | EBD En. Ür. ve Tic. A.S. | H | Kura | 20 | 10/12 | 05/14 | 04/15 | 11/15 | 70 | 250 | 248 | 252 | 0.15 | (3) | 0.70 | (3')* | 0.70 | (12) | 300 | 300 | 85 | 130 | (N) |
| Burç | Turkey | Aksa Energy Production Trade and Industry Co. Inc. | H | Göksu | 63 | 01/07 | 01/12 | - /15 | - /17 | 70 | 235 | 232 | 260 | 0.07 | (8) | 0.80 | (1) | separate | 300 | 300 | 60 | 50 to 60 | (F) | |
| Kasimlar | Turkey | Değirmenüstü Energy | H | Köprüçay | 43 | - /12 | - /13 | - /15 | - /16 | 90 | 235 | 330 | ||||||||||||
| Güneysinir Alanözü | Turkey | DSI - State Hydraulic Works | I | Yangılı | 3 | - /13 | - /14 | - /15 | - /15 | 38 | 270 | 71 | ||||||||||||
| Sariveliler Göktepe | Turkey | DSI - State Hydraulic Works | I | Gelenalan | 1 | - /13 | - /14 | - /15 | - /15 | 39 | 330 | 69 | 60 | 0 | (-) | |||||||||
| Bergama Çamavlu | Turkey | DSI - State Hydraulic Works | I | Hasanderesi | 1 | - /14 | - /14 | - /15 | - /15 | 40 | 241 | 69 | 0.10 | (1) | 0.80 | (1) | 300 | 300 | 85 | 35 | (F) | |||
| Yukari (Upper) Kaleköy | Turkey | Kalehan Energy Üretim ve Ticaret A.S. | H | Murat | 784 | 06/12 | 06/14 | 09/16 | 04/18 | 150 | 516 | 2224 | 2414 | 0.25 | (7) | 0.80 | (1) | 300 | 300 | 90 | 40 | (M) | ||
| Akçakoca | Turkey | DSI - State Hydraulic Works | I W | Sarma | 2 | 01/13 | 05/15 | 10/16 | - /17 | 66 | 148 | 85 | 130 | 0.10 | (1) | 0.80 | (1) | 0.80 | (12) | 300 | ||||
| Ardil | Turkey | DSI - State Hydraulic Works | I | Ardil | 11 | 03/13 | 05/14 | 12/16 | 02/17 | 54 | 266 | 108 | 158 | V | (1) | 0.80 | (1)* | 0.80 | (12) | 300 | 600 | 75 | 75 | |
| Kargi | Turkey | Limak Energy | H | Sakarya | 50 | - /11 | - /15 | 12/16 | 06/17 | 95 | 270 | 535 | ||||||||||||
| Uludere | Turkey | DSI - State Hydraulic Works | H | Ortasu | 17 | - /08 | - /12 | - /16 | - /18 | 77 | 431 | 800 | 887 | 0.10 | (1) | 0.80 | (1)* | 300 | 300 | 95 | 45 | (N) | ||
| Kirazlı Köprü | Turkey | DSI - State Hydraulic Works | H I | Gökırmak | 66 | - /99 | - /13 | - /16 | - /17 | 73 | 280 | 330 | 0.10 | (1) | 0.90 | (1) | 300 | 75 | 50 | (F) | ||||
| Beyyurdu | Turkey | DSI - State Hydraulic Works | H | Bembo | 8 | 09/08 | - /13 | - /16 | - /17 | 78 | 176 | 186 | 209 | 0.10 | (1) | 0.80 | (1)* | 0.80 | (12) | 300 | 1200 | 100 | 80 | (N) |
| Kelebek | Turkey | DSI - State Hydraulic Works | I W | Kelebek | 23 | - /12 | - /14 | - /16 | - /17 | 62 | 193 | 74 | 97 | 0.10 | (1) | 0.80 | (1)* | 0.80 | (12) | 300 | 300 | 120 | (F) | |
| Karamürsel Tepeköy [H-F] | Turkey | DSI - State Hydraulic Works | I | Uzundere | 1 | - /14 | - /15 | - /16 | - /16 | 19 | 170 | 240 | 0.10 | (1) | 0.70 | (1) | 300 | 300 | 80 | 48 | (F) | |||
| Güdül Kırkkavak | Turkey | DSI - State Hydraulic Works | I W | Ormanlik | 1 | - /14 | - /15 | - /16 | 10/17 | 49 | 265 | 114 | ||||||||||||
| Nazilli İsabeyli | Turkey | DSI - State Hydraulic Works | I | İsabeyli Deresi | 1 | - /14 | - /15 | - /16 | - /17 | 42 | 148 | 70 | ||||||||||||
| Oltu Sivridere | Turkey | DSI - State Hydraulic Works | I | Limontozu | 1 | - /14 | - /15 | - /16 | - /17 | 46 | 63 | 269 | ||||||||||||
| Karareis | Turkey | DSI - State Hydraulic Works | W | Camibogazi | 10 | - /14 | - /15 | - /16 | - /17 | 50 | 295 | 142 | 173 | 0.05 | (3') | 0.80 | (3')* | 0.80 | (12) | 300 | 300 | 98 | 52 | (F) |
| Köroglu Kotanli 1 [A-G] | Turkey | EBD Enerji Üretim. ve Tic. A.S. | H | Kura | 73 | 03/15 | 06/15 | 02/17 | 04/17 | 100 | 404 | 640 | 680 | V | (3') | 0.60 | (3')* | 0.60 | (12) | 300 | 300 | 85 | 130 | (N) |
| Üniversite | Turkey | DSI - State Hydraulic Works | W | Çırçıp | 1 | - /15 | - /16 | - /17 | - /17 | 36 | 110 | 20 | ||||||||||||
| Incir | Turkey | Enerji S.A. | H | Buyuk Cay | - /13 | - /16 | - /17 | - /18 | 150 | |||||||||||||||
| Ergani | Turkey | DSI - State Hydraulic Works | I | Golkum | 15 | - /14 | - /16 | - /17 | - /18 | 54 | 229 | 127 | 161 | 0.10 | (1) | 0.80 | (1) | 0.80 | (12) | 300 | 90 | 60 | (F) | |
| Balli | Turkey | DSI - State Hydraulic Works | H | Ortasu | 6 | - /08 | - /14 | - /18 | - /20 | 51 | 188 | 144 | 0.10 | (1) | 0.80 | (1) | 0.70 | (3') | 300 | 300 | 95 | 45 | (N) | |
| Kavsaktepe | Turkey | DSI - State Hydraulic Works | I | Ortasu Creek | 16 | 09/08 | - /14 | - /18 | - /20 | 76 | 268 | 518 | 540 | 0.10 | (1) | 0.80 | (1)* | 0.80 | (1) | 300 | 300 | 95 | 45 | (N) |
| Cudi-Circip | Turkey | DSI - State Hydraulic Works | W | Circip | 2 | - /16 | - /17 | - /18 | - /19 | 30 | 213 | 48 | 59 | 0.10 | (1) | 0.80 | (1) | 0.80 | (12) | 300 | 1200 | 98 | 52 | |
| Yeşilvadi (Beylerderesi) | Turkey | DSI - State Hydraulic Works | I | Beyler | 5 | - /16 | - /17 | - /18 | - /19 | 39 | 249 | 170 | V | (1) | 1.00 | (1) | 330 | 330 | 93 | 62 | (F) | |||
| Narli | Turkey | Aksa Energy Production Trade and Industry Co. Inc. | H | Göksu | 27 | - /16 | - /17 | - /18 | - /19 | 47 | 153 | 49 | 68 | (14) | (14) | 300 | 300 | 65 | 50 | (F) | ||||
| Melen | Turkey | DSI - State Hydraulic Works | H I W | Melen | 693 | - /13 | 06/15 | 03/19 | - /25 | 124 | 944 | 1871 | 2096 | 0.15 | (3') | 0.70 | (3')* | 0.70 | (3') | 300 | 300 | 90 | 60 | (F) |
| Taşköprü Hasanlı | Turkey | DSI - State Hydraulic Works | I W | Ayvali | 988 | 06/14 | 04/17 | 08/19 | 11/19 | 43 | 157 | 37 | 46 | 0.10 | (1) | 0.80 | (1) | 300 | 66 | 44 | (F) | |||
| Çay | Turkey | DSI - State Hydraulic Works | I | Uludere | 1 | 03/17 | 07/18 | 09/19 | 08/20 | 52 | 122 | 55 | 0.10 | (1) | 0.80 | (1) | 300 | 75 | 50 | |||||
| Karamürsel Ihsaniye | Turkey | DSI - State Hydraulic Works | I W | Suludere | 9 | 03/16 | 07/17 | 09/19 | 10/19 | 69 | 212 | 130 | 185 | 0.10 | (1) | 0.80 | (1) | 300 | 300 | 75 | 45 | (F) | ||
| Çetin [H-F] | Turkey | DSI - State Hydraulic Works | H | Botan | 614 | - /12 | 09/18 | 01/20 | 03/20 | 165 | 492 | 4741 | 4800 | 0.70 | (1) | 0.70 | (1)* | 0.70 | (1)* | 90 | 0 | (-) | ||
| Asagi (Lower) Kaleköy | Turkey | Kalehan Energy Üretim ve Ticaret A.S. | H | Murat | 556 | 03/13 | - /15 | - /20 | 04/21 | 125 | 346 | 1192 | 1342 | 0.25 | (7) | 0.80 | (3) | separate | 300 | 300 | 90 | 40 | (M) | |
| Ballikaya | Turkey | DSI - State Hydraulic Works | W | Mudurnu | 143 | - /13 | - /15 | - /20 | - /23 | 98 | 357 | 800 | 0.10 0.35 | (1) | 0.70 | (1) | 300 | 300 | 63 83 | 63 83 | ||||
| Dereçati | Turkey | DSI - State Hydraulic Works | I | Büyükdere | 2 | - /16 | - /18 | - /20 | - /21 | 51 | 174 | 110 | ||||||||||||
| Gürsöğüt 1 | Turkey | Limak Energy | H | Sakarya | 77 | - /19 | - /19 | - /20 | - /20 | 67 | 135 | 105 | 115 | |||||||||||
| Gürsöğüt 2 | Turkey | Limak Energy | H | Sakarya | 10 | - /19 | - /19 | - /20 | - /21 | 56 | 275 | 216 | 230 | |||||||||||
| Gümüshane Bahçecik | Turkey | DSI - State Hydraulic Works | W | Şenkale Deresi | 3 | 06/17 | 11/18 | - /21 | - /22 | 67 | 273 | 148 | 0.10 | (1) | 0.80 | (1)* | 300 | 300 | (N) | |||||
| Davarlı | Turkey | DSI - State Hydraulic Works | I | Kara Creek | 1 | - /16 | - /19 | - /21 | - /23 | 39 | 119 | 34 | ||||||||||||
| Gürün Çamlıca | Turkey | DSI - State Hydraulic Works | I | Kırkgöz Creek | 1 | - /17 | - /19 | - /21 | - /23 | 28 | 142 | 28 | 0.10 | 0.80 | 300 | 80 | 32 | |||||||
| Kapiçay | Turkey | DSI - State Hydraulic Works | H I | Basgöz | 5 | - /14 | - /18 | - /22 | - /24 | 50 | 136 | 126 | V | (1) | 0.80 | (1) | 300 | 84 | 56 | |||||
| Ulus Eldeş | Turkey | DSI - State Hydraulic Works | I W | Karakuz Creek | 1 | - /16 | - /20 | - /22 | - /23 | 46 | 125 | 38 | V 0.10 | (1) (1) | 0.80 | (1)* | 300 | 83 | 68 | (F) | ||||
| Haciömer | Turkey | DSI - State Hydraulic Works | I | Say | 4 | - /18 | - /20 | - /22 | - /23 | 50 | 173 | 94 | V | (1) | 0.80 | (1) | ||||||||
| Çalıcaalan | Turkey | DSI - State Hydraulic Works | I | Gök Creek | 1 | - /15 | - /20 | - /22 | - /24 | 33 | 195 | 50 | ||||||||||||
| Uluhan | Turkey | DSI - State Hydraulic Works | I | Gök Creek | 1 | - /17 | - /20 | - /22 | - /24 | 31 | 228 | 30 | ||||||||||||
| Kızlaryolu | Turkey | DSI - State Hydraulic Works | H I | Devrez | 115 | - /17 | - /20 | - /22 | - /23 | 92 | 261 | 447 | ||||||||||||
| Sorkun [H-F] | Turkey | DSI - State Hydraulic Works | I | Dokuzsele Creek | 1 | 07/17 | - /20 | - /22 | - /24 | 24 | 160 | 42 | ||||||||||||
| Babus | Turkey | DSI - State Hydraulic Works | I | Fındıklı Creek | 1 | 06/18 | - /21 | - /22 | 09/23 | 35 | 229 | 48 | V | (1) | 0.80 | (1)* | ||||||||
| Bursa Uludag | Turkey | DSI - State Hydraulic Works | F W | Kirkpinarlar | 1 | 10/21 | 01/22 | 08/23 | 10/23 | 28 | 168 | 60 | ||||||||||||
| Yozgat (Akdagmadeni) Bahçecik | Turkey | DSI - State Hydraulic Works | I | Gökdelen | 33 | - /15 | - /18 | - /23 | - /24 | 70 | 494 | 614 | V | (1) | 0.80 | (1) | 300 | 84 | 56 | (F) | ||||
| Göle Durançam | Turkey | DSI - State Hydraulic Works | I | Kür Çayı | 37 | - /16 | - /19 | - /23 | - /24 | 22 | 107 | 22 | V | 0.70 | ||||||||||
| Akçali 2 | Turkey | DSI - State Hydraulic Works | I | Sagin | 1 | - /16 | - /19 | - /23 | - /24 | 40 | 148 | 72 | 0.10 | (1) | 0.70 | (1)* | 0.70 | (12) | 300 | 300 | 90 | 60 | (F) | |
| Gündüzler | Turkey | DSI - State Hydraulic Works | I | Degirmen | 8 | - /16 | - /19 | - /23 | - /24 | 65 | 384 | 280 | V | (1) | 0.75 | (1) | 300 | 300 | 113 | 37 | (F) | |||
| Bahçecik | Turkey | W | 3 | - /16 | - /19 | - /23 | - /24 | 69 | 204 | |||||||||||||||
| Uzundere | Turkey | DSI - State Hydraulic Works | I | Uzun Creek | 1 | - /16 | - /20 | - /23 | - /24 | 42 | 59 | 35 | ||||||||||||
| Aldegirmen | Turkey | DSI - State Hydraulic Works | I W | Akasya | 24 | - /17 | - /20 | - /23 | - /24 | 59 | 227 | 189 | V | (1) | 0.80 | (1)* | 0.80 | (12) | 300 | 300 | 55 | 45 | (F) | |
| Akçakoca Altunçay | Turkey | DSI - State Hydraulic Works | I | Kilsuyu Creek | 1 | - /18 | - /20 | - /23 | - /24 | 33 | 95 | 24 | ||||||||||||
| Inandik | Turkey | DSI - State Hydraulic Works | I | Inandik | 31 | 04/18 | - /20 | - /23 | - /24 | 73 | 343 | 271 | 0.15 | (1) | 0.80 | (1) | 300 | 80 | 80 | |||||
| Manavgat Çardak | Turkey | DSI - State Hydraulic Works | H I | Sağırın Çayı | 8 | - /17 | - /22 | - /23 | - /24 | 44 | 185 | 540 | ||||||||||||
| Gölecik | Turkey | DSI - State Hydraulic Works | I W | Gölecik | 36 | 12/16 | 02/21 | 06/24 | - /24 | 95 | 424 | 900 | V | (3') | 0.80 | (3')* | 0.80 | (12) | 300 | 300 | 72 | 48 | (F) | |
| Tekke Kavakli | Turkey | DSI - State Hydraulic Works | I W | Çat | 2 | - /19 | - /22 | - /24 | - /25 | 42 | 325 | 225 | ||||||||||||
| Ula Çıtlık | Turkey | DSI - State Hydraulic Works | I | Büyükdere | 1 | - /17 | - /22 | - /24 | - /26 | 29 | 125 | 30 | ||||||||||||
| Uçarsu | Turkey | DSI - State Hydraulic Works | W | Uçarsu | 1 | - /18 | - /23 | - /24 | - /25 | 30 | 199 | 50 | ||||||||||||
| Tersun | Turkey | DSI - State Hydraulic Works | I | Tersun | 9 | - /16 | - /20 | - /25 | - /26 | 51 | 236 | 205 | 0.05 | (1) | 0.80 | (1) | ||||||||
| Zimari | Turkey | DSI - State Hydraulic Works | W | Zimari | 2 | - /18 | - /21 | - /25 | - /26 | 37 | 126 | 80 | ||||||||||||
| Üzengili | Turkey | DSI - State Hydraulic Works | I | Büyük Creek | 1 | - /18 | - /21 | - /25 | - /26 | 50 | 157 | 94 | 0.10 | (1) | 0.80 | (1) | ||||||||
| Sariçay | Turkey | DSI - State Hydraulic Works | W | Sariçay | 67 | 08/19 | - /22 | - /25 | 07/26 | 125 | 441 | 1163 | ||||||||||||
| Salipazari | Turkey | DSI - State Hydraulic Works | I W | Degimendere | 16 | - /17 | - /24 | - /26 | - /27 | 89 | 396 | 430 | ||||||||||||
| Manavgat Yeniköy Yerköprü | Turkey | DSI - State Hydraulic Works | I | Hamam Suyu | 1 | 09/23 | - /25 | - /26 | - /26 | 35 | 193 | 60 | ||||||||||||
| Söylemez | Turkey | DSI - State Hydraulic Works | H I | Aras | 1295 | 04/22 | 04/24 | 11/27 | 09/28 | 113 | 270 | 718 | 750 | |||||||||||
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Turkey
Owner: ERE Electricity Co.
Type: Gravity
Purpose(s): Hydropower
River: Güredin Creek
Reservoir capacity: 9 m3x106
Construction Dates
Start of Project: 01/98
Start of RCC: 01/98
End of RCC: 10/99
End of Project: 10/99
Specifications
Height: 36 metres
Length: 192 metres
Volume of RCC: 55 m3x103
Total volume: 60 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 50 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Ground-granulated blast-furnace slag |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Hardfill
Purpose(s): Hydropower / Irrigation / Water Supply
River: Buyuk Menderes
Reservoir capacity: 82 m3x106
Construction Dates
Start of Project: 04/94
Start of RCC: 04/94
End of RCC: 05/05
End of Project: 11/07
Specifications
Height: 107 metres
Length: 280 metres
Volume of RCC: 1500 m3x103
Total volume: 1685 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.89 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 50 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 20 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: Akköy Energy A.S.
Type: Gravity
Purpose(s): Hydropower
River: Harsit
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 07/05
Start of RCC: 07/05
End of RCC: 04/07
End of Project: 09/08
Specifications
Height: 38 metres
Length: 144 metres
Volume of RCC: 87 m3x103
Total volume: 101 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Natural pozzolan (ASTM Class N) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Hardfill
Purpose(s): Irrigation / Water Supply
River: Kucuk Menderes
Reservoir capacity: 248 m3x106
Construction Dates
Start of Project: 04/94
Start of RCC: 04/94
End of RCC: 04/08
End of Project: 11/08
Specifications
Height: 95 metres
Length: 800 metres
Volume of RCC: 2350 m3x103
Total volume: 2650 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.25 | Traditional concrete against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 30 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: Akkur Energy Production Trade and Industry Co. Inc.
Type: Gravity
Purpose(s): Hydropower
River: Göksu
Reservoir capacity: 63 m3x106
Construction Dates
Start of Project: 12/07
Start of RCC: 12/07
End of RCC: 02/10
End of Project: 08/10
Specifications
Height: 70 metres
Length: 256 metres
Volume of RCC: 194 m3x103
Total volume: 227 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.07 | Traditional concrete against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| separate |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 60 | Low-lime flyash (ASTM Class F) |
| 50 |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Çine
Reservoir capacity: 350 m3x106
Construction Dates
Start of Project: 12/95
Start of RCC: 12/95
End of RCC: 04/10
End of Project: 10/11
Specifications
Height: 137 metres
Length: 300 metres
Volume of RCC: 1560 m3x103
Total volume: 1650 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | RCC against precast concrete panels (GEVR/GE-RCC) |
| 0.20 |
Downstream
| Slope | Type |
|---|---|
| 0.85 | RCC against precast concrete panels (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.85 | RCC against precast concrete panels (GEVR/GE-RCC) |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| 75 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 105 | Low-lime flyash (ASTM Class F) |
| 95 |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Hydropower
River: Ortasui
Reservoir capacity: 18 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: 08/10
End of Project: 09/10
Specifications
Height: 67 metres
Length: 198 metres
Volume of RCC: 157 m3x103
Total volume: 231 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 600 |
Cementitious material
| Cement (kg/m3) |
|---|
| 125 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Turkey
Owner: Akfen Energy
Type: Hardfill
Purpose(s): Flood Control / Hydropower
River: Zamanti
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 04/08
Start of RCC: 04/08
End of RCC: 12/10
End of Project: 04/11
Specifications
Height: 52 metres
Length: 186 metres
Volume of RCC: 160 m3x103
Total volume: 182 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.70 | RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 88 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 37 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Hardfill
Purpose(s): Irrigation
River: İlyasdere
Reservoir capacity: 42 m3x106
Construction Dates
Start of Project: -/95
Start of RCC: -/95
End of RCC: -/10
End of Project: 12/11
Specifications
Height: 65 metres
Length: 477 metres
Volume of RCC: 743 m3x103
Total volume: 800 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.35 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 50 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: Senerji Enerji
Type: Gravity
Purpose(s): Hydropower
River: Çoruh
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: 05/09
Start of RCC: 05/09
End of RCC: 06/11
End of Project: 02/12
Specifications
Height: 72 metres
Length: 97 metres
Volume of RCC: 160 m3x103
Total volume: 175 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against formwork |
| 0.70 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 70 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: Enerjisa En. Ut. A.S.
Type: Gravity
Purpose(s): Hydropower
River: Göksu
Reservoir capacity: 51 m3x106
Construction Dates
Start of Project: 05/09
Start of RCC: 05/09
End of RCC: 10/11
End of Project: 12/11
Specifications
Height: 68 metres
Length: 304 metres
Volume of RCC: 349 m3x103
Total volume: 384 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.25 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 40 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: Püre Energy Üretim Tic. A.S.
Type: Gravity
Purpose(s): Hydropower
River: Aras
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/11
End of Project: 10/11
Specifications
Height: 55 metres
Length: 148 metres
Volume of RCC: 120 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Hydropower / Water Supply
River: Hezil
Reservoir capacity: 29 m3x106
Construction Dates
Start of Project: 08/08
Start of RCC: 08/08
End of RCC: -/11
End of Project: 02/12
Specifications
Height: 89 metres
Length: 356 metres
Volume of RCC: 718 m3x103
Total volume: 752 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 81 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | No pozzolan used |

Details
Country: Turkey
Owner: Karen Energy
Type: Gravity
Purpose(s): Hydropower
River: Balkusan
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: -/12
Specifications
Height: 48 metres
Length: 189 metres
Volume of RCC: 60 m3x103
Total volume: 76 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 1200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 75 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 50 | |

Details
Country: Turkey
Owner: Enerjisa En. Ut. A.S.
Type: Gravity
Purpose(s): Hydropower
River: Göksu
Reservoir capacity: 98 m3x106
Construction Dates
Start of Project: 07/09
Start of RCC: 07/09
End of RCC: 04/12
End of Project: -/13
Specifications
Height: 109 metres
Length: 413 metres
Volume of RCC: 975 m3x103
Total volume: 1050 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.60 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 45 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: MEM Enerji Elektrik Üretim Sanayi ve Ticaret A.Ş
Type: Gravity
Purpose(s): Hydropower
River: Göksu
Reservoir capacity: 18 m3x106
Construction Dates
Start of Project: 02/10
Start of RCC: 02/10
End of RCC: 05/12
End of Project: 07/12
Specifications
Height: 69 metres
Length: 118 metres
Volume of RCC: 96 m3x103
Total volume: 122 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.067 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast before RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 55 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 55 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: MCK Elektrik Uretim A.S.
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Emet
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: 05/10
Start of RCC: 05/10
End of RCC: 09/12
End of Project: 01/13
Specifications
Height: 39 metres
Length: 313 metres
Volume of RCC: 180 m3x103
Total volume: 210 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork with external geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 40 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: Akköy Energy A.S.
Type: Gravity
Purpose(s): Hydropower
River: Karaovacik
Reservoir capacity: 14 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: 09/12
End of Project: -/13
Specifications
Height: 60 metres
Length: 260 metres
Volume of RCC: 226 m3x103
Total volume: 306 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 85 | Natural pozzolan (ASTM Class N) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Hardfill
Purpose(s): Hydropower
River: Kizilirmak
Reservoir capacity: 41 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/12
End of Project: -/13
Specifications
Height: 42 metres
Length: 251 metres
Volume of RCC: 160 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Hydropower
River: Robozik
Reservoir capacity: 44 m3x106
Construction Dates
Start of Project: 09/08
Start of RCC: 09/08
End of RCC: -/12
End of Project: -/13
Specifications
Height: 39 metres
Length: 173 metres
Volume of RCC: 60 m3x103
Total volume: 64 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 1200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 77 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 63 | Natural pozzolan (ASTM Class N) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Flood Control / Irrigation
River: Manavgat
Reservoir capacity: 104 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: 01/14
End of Project: 05/14
Specifications
Height: 78 metres
Length: 448 metres
Volume of RCC: 620 m3x103
Total volume: 677 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.15 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 110 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 90 | Natural pozzolan (ASTM Class N) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Bembo
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: 09/08
Start of RCC: 09/08
End of RCC: 02/14
End of Project: 11/14
Specifications
Height: 69 metres
Length: 210 metres
Volume of RCC: 162 m3x103
Total volume: 202 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 1200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 80 | Natural pozzolan (ASTM Class N) |

Details
Country: Turkey
Owner: Kalehan Energy Üretim ve Ticaret A.S.
Type: Hardfill
Purpose(s): Hydropower
River: Murat
Reservoir capacity: 369 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: 03/14
End of Project: 03/15
Specifications
Height: 97 metres
Length: 361 metres
Volume of RCC: 1480 m3x103
Total volume: 1661 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.70 | RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 40 | Milled sand |

Details
Country: Turkey
Owner: Darenhes A.S.
Type: Hardfill
Purpose(s): Hydropower
River: PeriSuyu
Reservoir capacity: 358 m3x106
Construction Dates
Start of Project: 11/10
Start of RCC: 11/10
End of RCC: 10/14
End of Project: -/15
Specifications
Height: 88 metres
Length: 500 metres
Volume of RCC: 760 m3x103
Total volume: 838 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 1200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 120 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Turkey
Owner: Akköy Energy A.S.
Type: Gravity
Purpose(s): Hydropower
River: Gevne
Reservoir capacity: 109 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/14
End of Project: -/15
Specifications
Height: 113 metres
Length: 300 metres
Volume of RCC: 490 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: Pelin Energy
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Kura
Reservoir capacity: 148 m3x106
Construction Dates
Start of Project: 01/10
Start of RCC: 01/10
End of RCC: -/14
End of Project: 02/15
Specifications
Height: 159 metres
Length: 230 metres
Volume of RCC: 637 m3x103
Total volume: 780 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Flood Control
River: Bağ
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/14
End of Project: -/14
Specifications
Height: 31 metres
Length: 118 metres
Volume of RCC: 30 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Hardfill
Purpose(s): Hydropower / Irrigation / Water Supply
River: Zamanti
Reservoir capacity: 195 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/14
End of Project: 06/15
Specifications
Height: 37 metres
Length: 842 metres
Volume of RCC: 1890 m3x103
Total volume: 1943 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.76 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.76 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 1200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Hydropower
River: Ortasu
Reservoir capacity: 20 m3x106
Construction Dates
Start of Project: 09/08
Start of RCC: 09/08
End of RCC: -/14
End of Project: -/15
Specifications
Height: 53 metres
Length: 431 metres
Volume of RCC: 392 m3x103
Total volume: 460 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 600 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Hydropower
River: Robozik
Reservoir capacity: 13 m3x106
Construction Dates
Start of Project: 09/08
Start of RCC: 09/08
End of RCC: -/14
End of Project: -/15
Specifications
Height: 66 metres
Length: 165 metres
Volume of RCC: 131 m3x103
Total volume: 138 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 1200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 77 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 63 | Natural pozzolan (ASTM Class N) |

Details
Country: Turkey
Owner: Derin Enerji Uretim San. Ve Tic. A.S.
Type: Gravity
Purpose(s): Hydropower
River: Kökün
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/14
End of Project: -/15
Specifications
Height: 45 metres
Length: 162 metres
Volume of RCC: 400 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: Peker Energy Inc
Type: Gravity
Purpose(s): Hydropower
River: Büyük Menderes
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/14
End of Project: -/15
Specifications
Height: 61 metres
Length: 145 metres
Volume of RCC: 150 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: Ozdogan Enerji
Type: Gravity
Purpose(s): Hydropower
River: Oltu
Reservoir capacity: 308 m3x106
Construction Dates
Start of Project: 04/11
Start of RCC: 04/11
End of RCC: 02/15
End of Project: 10/15
Specifications
Height: 177 metres
Length: 405 metres
Volume of RCC: 1650 m3x103
Total volume: 1900 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 50 |
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 110 | Low-lime flyash (ASTM Class F) |
| 120 |

Details
Country: Turkey
Owner: Bereket Energy
Type: Hardfill
Purpose(s): Hydropower
River: Zamanti
Reservoir capacity: 109 m3x106
Construction Dates
Start of Project: 04/11
Start of RCC: 04/11
End of RCC: 03/15
End of Project: -/16
Specifications
Height: 133 metres
Length: 200 metres
Volume of RCC: 749 m3x103
Total volume: 900 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.30 | Traditional concrete against formwork |
| 1.00 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.60 | Traditional concrete against formwork |
| 1.00 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 50 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 50 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: EBD En. Ür. ve Tic. A.S.
Type: Arch-Gravity
Purpose(s): Hydropower
River: Kura
Reservoir capacity: 20 m3x106
Construction Dates
Start of Project: 10/12
Start of RCC: 10/12
End of RCC: 04/15
End of Project: 11/15
Specifications
Height: 70 metres
Length: 250 metres
Volume of RCC: 248 m3x103
Total volume: 252 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.15 | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 130 | Natural pozzolan (ASTM Class N) |

Details
Country: Turkey
Owner: Aksa Energy Production Trade and Industry Co. Inc.
Type: Gravity
Purpose(s): Hydropower
River: Göksu
Reservoir capacity: 63 m3x106
Construction Dates
Start of Project: 01/07
Start of RCC: 01/07
End of RCC: -/15
End of Project: -/17
Specifications
Height: 70 metres
Length: 235 metres
Volume of RCC: 232 m3x103
Total volume: 260 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.07 | RCC against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| separate |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 50 to | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: Değirmenüstü Energy
Type: Gravity
Purpose(s): Hydropower
River: Köprüçay
Reservoir capacity: 43 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/15
End of Project: -/16
Specifications
Height: 90 metres
Length: 235 metres
Volume of RCC: 330 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Yangılı
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/15
End of Project: -/15
Specifications
Height: 38 metres
Length: 270 metres
Volume of RCC: 71 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Gelenalan
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/15
End of Project: -/15
Specifications
Height: 39 metres
Length: 330 metres
Volume of RCC: 69 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Hasanderesi
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/15
End of Project: -/15
Specifications
Height: 40 metres
Length: 241 metres
Volume of RCC: 69 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 35 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: Kalehan Energy Üretim ve Ticaret A.S.
Type: Gravity
Purpose(s): Hydropower
River: Murat
Reservoir capacity: 784 m3x106
Construction Dates
Start of Project: 06/12
Start of RCC: 06/12
End of RCC: 09/16
End of Project: 04/18
Specifications
Height: 150 metres
Length: 516 metres
Volume of RCC: 2224 m3x103
Total volume: 2414 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.25 | RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 40 | Milled sand |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Sarma
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 01/13
Start of RCC: 01/13
End of RCC: 10/16
End of Project: -/17
Specifications
Height: 66 metres
Length: 148 metres
Volume of RCC: 85 m3x103
Total volume: 130 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Ardil
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: 03/13
Start of RCC: 03/13
End of RCC: 12/16
End of Project: 02/17
Specifications
Height: 54 metres
Length: 266 metres
Volume of RCC: 108 m3x103
Total volume: 158 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 600 |
Cementitious material
| Cement (kg/m3) |
|---|
| 75 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 75 | |

Details
Country: Turkey
Owner: Limak Energy
Type: Gravity
Purpose(s): Hydropower
River: Sakarya
Reservoir capacity: 50 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: 12/16
End of Project: 06/17
Specifications
Height: 95 metres
Length: 270 metres
Volume of RCC: 535 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Hydropower
River: Ortasu
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/16
End of Project: -/18
Specifications
Height: 77 metres
Length: 431 metres
Volume of RCC: 800 m3x103
Total volume: 887 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 95 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 45 | Natural pozzolan (ASTM Class N) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Gökırmak
Reservoir capacity: 66 m3x106
Construction Dates
Start of Project: -/99
Start of RCC: -/99
End of RCC: -/16
End of Project: -/17
Specifications
Height: 73 metres
Length: 280 metres
Volume of RCC: 330 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.90 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 75 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 50 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Hydropower
River: Bembo
Reservoir capacity: 8 m3x106
Construction Dates
Start of Project: 09/08
Start of RCC: 09/08
End of RCC: -/16
End of Project: -/17
Specifications
Height: 78 metres
Length: 176 metres
Volume of RCC: 186 m3x103
Total volume: 209 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 1200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 80 | Natural pozzolan (ASTM Class N) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Kelebek
Reservoir capacity: 23 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/16
End of Project: -/17
Specifications
Height: 62 metres
Length: 193 metres
Volume of RCC: 74 m3x103
Total volume: 97 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 120 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Hardfill
Purpose(s): Irrigation
River: Uzundere
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/16
End of Project: -/16
Specifications
Height: 19 metres
Length: 170 metres
Volume of RCC: 240 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 48 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Ormanlik
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/16
End of Project: 10/17
Specifications
Height: 49 metres
Length: 265 metres
Volume of RCC: 114 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: İsabeyli Deresi
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/16
End of Project: -/17
Specifications
Height: 42 metres
Length: 148 metres
Volume of RCC: 70 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Limontozu
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/16
End of Project: -/17
Specifications
Height: 46 metres
Length: 63 metres
Volume of RCC: 269 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Water Supply
River: Camibogazi
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/16
End of Project: -/17
Specifications
Height: 50 metres
Length: 295 metres
Volume of RCC: 142 m3x103
Total volume: 173 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.05 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 98 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 52 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: EBD Enerji Üretim. ve Tic. A.S.
Type: Arch-Gravity
Purpose(s): Hydropower
River: Kura
Reservoir capacity: 73 m3x106
Construction Dates
Start of Project: 03/15
Start of RCC: 03/15
End of RCC: 02/17
End of Project: 04/17
Specifications
Height: 100 metres
Length: 404 metres
Volume of RCC: 640 m3x103
Total volume: 680 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.60 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.60 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 130 | Natural pozzolan (ASTM Class N) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Water Supply
River: Çırçıp
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/17
End of Project: -/17
Specifications
Height: 36 metres
Length: 110 metres
Volume of RCC: 20 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: Enerji S.A.
Type: Gravity
Purpose(s): Hydropower
River: Buyuk Cay
Reservoir capacity: -
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/17
End of Project: -/18
Specifications
Height: 150 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Golkum
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/17
End of Project: -/18
Specifications
Height: 54 metres
Length: 229 metres
Volume of RCC: 127 m3x103
Total volume: 161 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 60 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Hydropower
River: Ortasu
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/18
End of Project: -/20
Specifications
Height: 51 metres
Length: 188 metres
Volume of RCC: 144 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 95 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 45 | Natural pozzolan (ASTM Class N) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Ortasu Creek
Reservoir capacity: 16 m3x106
Construction Dates
Start of Project: 09/08
Start of RCC: 09/08
End of RCC: -/18
End of Project: -/20
Specifications
Height: 76 metres
Length: 268 metres
Volume of RCC: 518 m3x103
Total volume: 540 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 95 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 45 | Natural pozzolan (ASTM Class N) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Water Supply
River: Circip
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/18
End of Project: -/19
Specifications
Height: 30 metres
Length: 213 metres
Volume of RCC: 48 m3x103
Total volume: 59 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 1200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 98 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 52 | |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Beyler
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/18
End of Project: -/19
Specifications
Height: 39 metres
Length: 249 metres
Volume of RCC: 170 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 1.00 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 330 | 330 |
Cementitious material
| Cement (kg/m3) |
|---|
| 93 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 62 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: Aksa Energy Production Trade and Industry Co. Inc.
Type: Gravity
Purpose(s): Hydropower
River: Göksu
Reservoir capacity: 27 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/18
End of Project: -/19
Specifications
Height: 47 metres
Length: 153 metres
Volume of RCC: 49 m3x103
Total volume: 68 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Slip-formed/extruded facing elements |
Downstream
| Slope | Type |
|---|---|
| Slip-formed/extruded facing elements |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 50 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Melen
Reservoir capacity: 693 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: 03/19
End of Project: -/25
Specifications
Height: 124 metres
Length: 944 metres
Volume of RCC: 1871 m3x103
Total volume: 2096 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.15 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 60 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Ayvali
Reservoir capacity: 988 m3x106
Construction Dates
Start of Project: 06/14
Start of RCC: 06/14
End of RCC: 08/19
End of Project: 11/19
Specifications
Height: 43 metres
Length: 157 metres
Volume of RCC: 37 m3x103
Total volume: 46 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 66 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 44 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Uludere
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 03/17
Start of RCC: 03/17
End of RCC: 09/19
End of Project: 08/20
Specifications
Height: 52 metres
Length: 122 metres
Volume of RCC: 55 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 75 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 50 | |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Suludere
Reservoir capacity: 9 m3x106
Construction Dates
Start of Project: 03/16
Start of RCC: 03/16
End of RCC: 09/19
End of Project: 10/19
Specifications
Height: 69 metres
Length: 212 metres
Volume of RCC: 130 m3x103
Total volume: 185 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 75 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 45 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Hardfill
Purpose(s): Hydropower
River: Botan
Reservoir capacity: 614 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: 01/20
End of Project: 03/20
Specifications
Height: 165 metres
Length: 492 metres
Volume of RCC: 4741 m3x103
Total volume: 4800 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Turkey
Owner: Kalehan Energy Üretim ve Ticaret A.S.
Type: Gravity
Purpose(s): Hydropower
River: Murat
Reservoir capacity: 556 m3x106
Construction Dates
Start of Project: 03/13
Start of RCC: 03/13
End of RCC: -/20
End of Project: 04/21
Specifications
Height: 125 metres
Length: 346 metres
Volume of RCC: 1192 m3x103
Total volume: 1342 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.25 | RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| separate |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 40 | Milled sand |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Water Supply
River: Mudurnu
Reservoir capacity: 143 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/20
End of Project: -/23
Specifications
Height: 98 metres
Length: 357 metres
Volume of RCC: 800 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
| 0.35 |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 63 |
| 83 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 63 | |
| 83 |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Büyükdere
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/20
End of Project: -/21
Specifications
Height: 51 metres
Length: 174 metres
Volume of RCC: 110 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: Limak Energy
Type: Gravity
Purpose(s): Hydropower
River: Sakarya
Reservoir capacity: 77 m3x106
Construction Dates
Start of Project: -/19
Start of RCC: -/19
End of RCC: -/20
End of Project: -/20
Specifications
Height: 67 metres
Length: 135 metres
Volume of RCC: 105 m3x103
Total volume: 115 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: Limak Energy
Type: Gravity
Purpose(s): Hydropower
River: Sakarya
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: -/19
Start of RCC: -/19
End of RCC: -/20
End of Project: -/21
Specifications
Height: 56 metres
Length: 275 metres
Volume of RCC: 216 m3x103
Total volume: 230 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Water Supply
River: Şenkale Deresi
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 06/17
Start of RCC: 06/17
End of RCC: -/21
End of Project: -/22
Specifications
Height: 67 metres
Length: 273 metres
Volume of RCC: 148 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Natural pozzolan (ASTM Class N) | |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Kara Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/21
End of Project: -/23
Specifications
Height: 39 metres
Length: 119 metres
Volume of RCC: 34 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Kırkgöz Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/21
End of Project: -/23
Specifications
Height: 28 metres
Length: 142 metres
Volume of RCC: 28 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 |
Downstream
| Slope | Type |
|---|---|
| 0.80 |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 32 | |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Basgöz
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/22
End of Project: -/24
Specifications
Height: 50 metres
Length: 136 metres
Volume of RCC: 126 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 56 | |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Karakuz Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/22
End of Project: -/23
Specifications
Height: 46 metres
Length: 125 metres
Volume of RCC: 38 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 83 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 68 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Say
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: -/22
End of Project: -/23
Specifications
Height: 50 metres
Length: 173 metres
Volume of RCC: 94 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Gök Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/22
End of Project: -/24
Specifications
Height: 33 metres
Length: 195 metres
Volume of RCC: 50 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Gök Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/22
End of Project: -/24
Specifications
Height: 31 metres
Length: 228 metres
Volume of RCC: 30 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Devrez
Reservoir capacity: 115 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/22
End of Project: -/23
Specifications
Height: 92 metres
Length: 261 metres
Volume of RCC: 447 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Hardfill
Purpose(s): Irrigation
River: Dokuzsele Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 07/17
Start of RCC: 07/17
End of RCC: -/22
End of Project: -/24
Specifications
Height: 24 metres
Length: 160 metres
Volume of RCC: 42 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Fındıklı Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 06/18
Start of RCC: 06/18
End of RCC: -/22
End of Project: 09/23
Specifications
Height: 35 metres
Length: 229 metres
Volume of RCC: 48 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Kirkpinarlar
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 10/21
Start of RCC: 10/21
End of RCC: 08/23
End of Project: 10/23
Specifications
Height: 28 metres
Length: 168 metres
Volume of RCC: -
Total volume: 60 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Gökdelen
Reservoir capacity: 33 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/23
End of Project: -/24
Specifications
Height: 70 metres
Length: 494 metres
Volume of RCC: 614 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 56 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Kür Çayı
Reservoir capacity: 37 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/23
End of Project: -/24
Specifications
Height: 22 metres
Length: 107 metres
Volume of RCC: 22 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.70 |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Sagin
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/23
End of Project: -/24
Specifications
Height: 40 metres
Length: 148 metres
Volume of RCC: -
Total volume: 72 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 60 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Degirmen
Reservoir capacity: 8 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/23
End of Project: -/24
Specifications
Height: 65 metres
Length: 384 metres
Volume of RCC: 280 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 113 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 37 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/23
End of Project: -/24
Specifications
Height: 69 metres
Length: -
Volume of RCC: 204 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Uzun Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/23
End of Project: -/24
Specifications
Height: 42 metres
Length: 59 metres
Volume of RCC: 35 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Akasya
Reservoir capacity: 24 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/23
End of Project: -/24
Specifications
Height: 59 metres
Length: 227 metres
Volume of RCC: -
Total volume: 189 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 55 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 45 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Kilsuyu Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: -/23
End of Project: -/24
Specifications
Height: 33 metres
Length: 95 metres
Volume of RCC: -
Total volume: 24 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Inandik
Reservoir capacity: 31 m3x106
Construction Dates
Start of Project: 04/18
Start of RCC: 04/18
End of RCC: -/23
End of Project: -/24
Specifications
Height: 73 metres
Length: 343 metres
Volume of RCC: 271 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.15 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 80 | |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Gölecik
Reservoir capacity: 36 m3x106
Construction Dates
Start of Project: 12/16
Start of RCC: 12/16
End of RCC: 06/24
End of Project: -/24
Specifications
Height: 95 metres
Length: 424 metres
Volume of RCC: -
Total volume: 900 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 48 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Çat
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/19
Start of RCC: -/19
End of RCC: -/24
End of Project: -/25
Specifications
Height: 42 metres
Length: 325 metres
Volume of RCC: 225 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Büyükdere
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/24
End of Project: -/26
Specifications
Height: 29 metres
Length: 125 metres
Volume of RCC: 30 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Water Supply
River: Uçarsu
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: -/24
End of Project: -/25
Specifications
Height: 30 metres
Length: 199 metres
Volume of RCC: 50 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Tersun
Reservoir capacity: 9 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/25
End of Project: -/26
Specifications
Height: 51 metres
Length: 236 metres
Volume of RCC: 205 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.05 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Water Supply
River: Zimari
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: -/25
End of Project: -/26
Specifications
Height: 37 metres
Length: 126 metres
Volume of RCC: -
Total volume: 80 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Büyük Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: -/25
End of Project: -/26
Specifications
Height: 50 metres
Length: 157 metres
Volume of RCC: 94 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Water Supply
River: Sariçay
Reservoir capacity: 67 m3x106
Construction Dates
Start of Project: 08/19
Start of RCC: 08/19
End of RCC: -/25
End of Project: 07/26
Specifications
Height: 125 metres
Length: 441 metres
Volume of RCC: 1163 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Degimendere
Reservoir capacity: 16 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/26
End of Project: -/27
Specifications
Height: 89 metres
Length: 396 metres
Volume of RCC: 430 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Aras
Reservoir capacity: 1295 m3x106
Construction Dates
Start of Project: 04/22
Start of RCC: 04/22
End of RCC: 11/27
End of Project: 09/28
Specifications
Height: 113 metres
Length: 270 metres
Volume of RCC: 718 m3x103
Total volume: 750 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates