Dam Search Results
- Dimensions
- Height: 103 metres
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
| Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
| Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
| Al Wehdah | Jordan/ Syria | Jordan Valley Authority, Ministry of Water and Irrigation | W | Yarmouk | 110 | 06/03 | 02/05 | 07/06 | 12/07 | 103 | 485 | 1426 | 1478 | V 0.60 | (3') | 0.80 | (3')* | 0.80 | 300 | 300 | 70 60 | 60 60 | (F) | |
| Wuyi | China | Dina | 99 | - /05 | - /07 | - /10 | - /12 | 103 | ||||||||||||||||
| San Vicente Dam Raise | USA | San Diego County Water Authority and City of San Diego | W | San Diego | 299 | 06/09 | 09/11 | 09/12 | 09/14 | 103 | 474 | 459 | 465 | V | (4') | 0.78 | (3')* | 0.78 | (3')* | 300 | 300 | 86 | 127 | (F) |
| Upper Paung Laung | Myanmar | Department of Hydroelectric Power - Ministry of Electric Power | H | Paung Laung | 1285 | 01/06 | 01/11 | 12/13 | - /14 | 103 | 537 | 936 | 1100 | V | (3') | 0.80 | (3')* | 0.80 | (12) | 300 | 300 | 90 | 140 | (N) |
| Gokayama | Japan | Fukuoka Prefecture | F N W | Naka | 40 | 06/12 | 06/14 | 07/15 | 03/18 | 103 | 556 | 634 | 935 | V 1.00 | (1) (1) | 0.76 | (1) | 0.76 | (1) | 250 | 1000 | 104 | 26 | (F) |
| Enciso | Spain | Confederación Hidrográfica del Ebro, Ministerio de Agricultura Alimentación y Medio Ambiente | I W | Cidacos | 47 | 07/08 | 08/14 | 07/17 | 09/18 | 103 | 376 | 698 | 765 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 60 | 140 | (F) |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Jordan/ Syria
Owner: Jordan Valley Authority, Ministry of Water and Irrigation
Type: Gravity
Purpose(s): Water Supply
River: Yarmouk
Reservoir capacity: 110 m3x106
Construction Dates
Start of Project: 06/03
Start of RCC: 06/03
End of RCC: 07/06
End of Project: 12/07
Specifications
Height: 103 metres
Length: 485 metres
Volume of RCC: 1426 m3x103
Total volume: 1478 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.60 |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 60 | Low-lime flyash (ASTM Class F) |
| 60 |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): unknown
River: Dina
Reservoir capacity: 99 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/10
End of Project: -/12
Specifications
Height: 103 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: USA
Owner: San Diego County Water Authority and City of San Diego
Type: Gravity
Purpose(s): Water Supply
River: San Diego
Reservoir capacity: 299 m3x106
Construction Dates
Start of Project: 06/09
Start of RCC: 06/09
End of RCC: 09/12
End of Project: 09/14
Specifications
Height: 103 metres
Length: 474 metres
Volume of RCC: 459 m3x103
Total volume: 465 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork with external geomembrane (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.78 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.78 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 86 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 127 | Low-lime flyash (ASTM Class F) |

Details
Country: Myanmar
Owner: Department of Hydroelectric Power - Ministry of Electric Power
Type: Gravity
Purpose(s): Hydropower
River: Paung Laung
Reservoir capacity: 1285 m3x106
Construction Dates
Start of Project: 01/06
Start of RCC: 01/06
End of RCC: 12/13
End of Project: -/14
Specifications
Height: 103 metres
Length: 537 metres
Volume of RCC: 936 m3x103
Total volume: 1100 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 140 | Natural pozzolan (ASTM Class N) |

Details
Country: Japan
Owner: Fukuoka Prefecture
Type: Gravity
Purpose(s): Flood Control / Navigation / Water Supply
River: Naka
Reservoir capacity: 40 m3x106
Construction Dates
Start of Project: 06/12
Start of RCC: 06/12
End of RCC: 07/15
End of Project: 03/18
Specifications
Height: 103 metres
Length: 556 metres
Volume of RCC: 634 m3x103
Total volume: 935 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 1.00 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 104 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 26 | Low-lime flyash (ASTM Class F) |

Details
Country: Spain
Owner: Confederación Hidrográfica del Ebro, Ministerio de Agricultura Alimentación y Medio Ambiente
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Cidacos
Reservoir capacity: 47 m3x106
Construction Dates
Start of Project: 07/08
Start of RCC: 07/08
End of RCC: 07/17
End of Project: 09/18
Specifications
Height: 103 metres
Length: 376 metres
Volume of RCC: 698 m3x103
Total volume: 765 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 140 | Low-lime flyash (ASTM Class F) |

Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates
