Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Mangla Emergency Spillway Control WeirPakistanWAPDA (Water and Power Development Authority)H IJhelum650008/0412/0711/0801/09173705479V
0.30
(3')
(3')*
V
0.70
(3')
(3')*
0.70(3')*30030060120(S)
Khan KhwarPakistanWAPDA (Water and Power Development Authority) and CTGC (China Three Gorges Corp.)HDuber Khwar 04/03- /06- /1004/1246112             
Gomal Zam
[A-G]
PakistanWAPDA (Water and Power Development Authority)F H IGomal142407/0208/0709/1106/13133231390474V 0.60 0.60 3003000 to
4000
9191(F)
Duber KhwarPakistanWAPDA (Water and Power Development Authority) and CTGC (China Three Gorges Corp.)HDuber Khwar 06/03- /08- /1201/1441202             
Allai KhwarPakistanWAPDA (Water and Power Development Authority) and CTGC (China Three Gorges Corp.)HAllai Khwar 01/05- /09- /1203/135188             
Neelum-JhelumPakistanNeelum Jhelum Hydropower CompanyHNeelum8- /08- /1408/1611/1747125 156        15451(S)
GulpurPakistanWAPDA (Water and Power Development Authority) and MIRA Power Ltd. (a subsidiary of KOSEP)HPoonch2209/14- /16- /1802/2035238             

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Pakistan

Owner: WAPDA (Water and Power Development Authority)

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Jhelum

Reservoir capacity: 6500 m3x106

Construction Dates

Start of Project: 08/04

Start of RCC: 08/04

End of RCC: 11/08

End of Project: 01/09

Specifications

Height: 17 metres

Length: 370 metres

Volume of RCC: 54 m3x103

Total volume: 79 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
0.30RCC against formwork (GEVR/GE-RCC)  [stepped face]
Downstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
0.70RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
120Ground-granulated blast-furnace slag
  
Mangla Emergency Spillway Control Weir completed
Mangla Emergency Spillway Control Weir completed

Full Dam Information

Details

Country: Pakistan

Owner: WAPDA (Water and Power Development Authority) and CTGC (China Three Gorges Corp.)

Type: Gravity

Purpose(s): Hydropower

River: Duber Khwar

Reservoir capacity: -

Construction Dates

Start of Project: 04/03

Start of RCC: 04/03

End of RCC: -/10

End of Project: 04/12

Specifications

Height: 46 metres

Length: 112 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Khan Khwar completed
Khan Khwar completed

Full Dam Information

Details

Country: Pakistan

Owner: WAPDA (Water and Power Development Authority)

Type: Arch-Gravity

Purpose(s): Flood Control / Hydropower / Irrigation

River: Gomal

Reservoir capacity: 1424 m3x106

Construction Dates

Start of Project: 07/02

Start of RCC: 07/02

End of RCC: 09/11

End of Project: 06/13

Specifications

Height: 133 metres

Length: 231 metres

Volume of RCC: 390 m3x103

Total volume: 474 m3x103

Construction Methods

Facings

Upstream
SlopeType
Vertical 
Downstream
SlopeType
0.60 
Spillway
SlopeType
0.60 

Placement

Layers (mm)Lifts (mm)
3003000  to
 4000

Cementitious material

Cement (kg/m3)
91
Pozzolan (kg/m3)Pozzolan Type
91Low-lime flyash (ASTM Class F)
  
Gomal Zam completed
Gomal Zam completed

Full Dam Information

Details

Country: Pakistan

Owner: WAPDA (Water and Power Development Authority) and CTGC (China Three Gorges Corp.)

Type: Gravity

Purpose(s): Hydropower

River: Duber Khwar

Reservoir capacity: -

Construction Dates

Start of Project: 06/03

Start of RCC: 06/03

End of RCC: -/12

End of Project: 01/14

Specifications

Height: 41 metres

Length: 202 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Duber Khwar completed
Duber Khwar completed

Full Dam Information

Details

Country: Pakistan

Owner: WAPDA (Water and Power Development Authority) and CTGC (China Three Gorges Corp.)

Type: Gravity

Purpose(s): Hydropower

River: Allai Khwar

Reservoir capacity: -

Construction Dates

Start of Project: 01/05

Start of RCC: 01/05

End of RCC: -/12

End of Project: 03/13

Specifications

Height: 51 metres

Length: 88 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Allai Khwar completed
Allai Khwar completed

Full Dam Information

Details

Country: Pakistan

Owner: Neelum Jhelum Hydropower Company

Type: Gravity

Purpose(s): Hydropower

River: Neelum

Reservoir capacity: 8 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: 08/16

End of Project: 11/17

Specifications

Height: 47 metres

Length: 125 metres

Volume of RCC: -

Total volume: 156 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
154
Pozzolan (kg/m3)Pozzolan Type
51Ground-granulated blast-furnace slag
  
Neelum-Jhelum under construction
Neelum-Jhelum under construction

Full Dam Information

Details

Country: Pakistan

Owner: WAPDA (Water and Power Development Authority) and MIRA Power Ltd. (a subsidiary of KOSEP)

Type: Gravity

Purpose(s): Hydropower

River: Poonch

Reservoir capacity: 22 m3x106

Construction Dates

Start of Project: 09/14

Start of RCC: 09/14

End of RCC: -/18

End of Project: 02/20

Specifications

Height: 35 metres

Length: 238 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates