Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Burton GorgeAustraliaNorth Goonyella Coal PropertiesWIsaac2007/9209/9211/9212/92262856468V
1.00
(8)
(17)
0.80
1.00
(3)*
(17)
0.80(13)*300300850(-) -
CristalandiaBrazilEmpresa Baiana de Aguas e Saneamento S/AWde Contas17- /07- /07- /08- /08284486168           
Kasegawa auxiliary dam
[H-F]
JapanMinistry of Land, Infrastructure, Transport and TourismF H I WKase103/0810/0906/1009/102911652680.80(12)0.80(12)0.80(12)250750800(-) -
NarliTurkeyAkkur Energy Production Trade and Industry Co. Inc.HGöksu27- /16- /17- /18- /19471534968 (14) (14)  3003006550(F)

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Australia

Owner: North Goonyella Coal Properties

Type: Gravity

Purpose(s): Water Supply

River: Isaac

Reservoir capacity: 20 m3x106

Construction Dates

Start of Project: 07/92

Start of RCC: 07/92

End of RCC: 11/92

End of Project: 12/92

Specifications

Height: 26 metres

Length: 285 metres

Volume of RCC: 64 m3x103

Total volume: 68 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against precast concrete panels with geomembrane
1.00Unformed face of RCC
Downstream
SlopeType
0.80RCC against formwork  [stepped face]
1.00Unformed face of RCC
Spillway
SlopeType
0.80Reinforced concrete cast against precast units or slip-formed facing elements  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
85
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Burton Gorge completed
Burton Gorge completed

Full Dam Information

Details

Country: Brazil

Owner: Empresa Baiana de Aguas e Saneamento S/A

Type: Gravity

Purpose(s): Water Supply

River: de Contas

Reservoir capacity: 17 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/08

End of Project: -/08

Specifications

Height: 28 metres

Length: 448 metres

Volume of RCC: 61 m3x103

Total volume: 68 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Cristalandia on Google Earth
Cristalandia on Google Earth

Full Dam Information

Details

Country: Japan

Owner: Ministry of Land, Infrastructure, Transport and Tourism

Type: Hardfill

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Kase

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 03/08

Start of RCC: 03/08

End of RCC: 06/10

End of Project: 09/10

Specifications

Height: 29 metres

Length: 116 metres

Volume of RCC: 52 m3x103

Total volume: 68 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.80Reinforced conventional concrete cast after RCC placement
Downstream
SlopeType
0.80Reinforced conventional concrete cast after RCC placement
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
250750

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Kasegawa auxiliary dam completed
Kasegawa auxiliary dam completed

Full Dam Information

Details

Country: Turkey

Owner: Akkur Energy Production Trade and Industry Co. Inc.

Type: Gravity

Purpose(s): Hydropower

River: Göksu

Reservoir capacity: 27 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/18

End of Project: -/19

Specifications

Height: 47 metres

Length: 153 metres

Volume of RCC: 49 m3x103

Total volume: 68 m3x103

Construction Methods

Facings

Upstream
SlopeType
 Slip-formed/extruded facing elements
Downstream
SlopeType
 Slip-formed/extruded facing elements
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
65
Pozzolan (kg/m3)Pozzolan Type
50Low-lime flyash (ASTM Class F)
  
Photo coming soon

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates