Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Longmentan Nº1ChinaH I WChanxi5312/8512/8708/8909/89581507193V
0.30
(12)
(12)
0.75(10)0.75(13)30030072
54
82
86
(F)
TomisatoJapanF I WDouzan5302/92- /9502/9703/00111250355510V(1)0.76(1)0.76(1)250750
1000
84
72
36
48
(F)
DengkeChinaHLongchuan53- /09- /10- /11- /1276239             
Lijiahe
[A]
ChinaHBahe53- /11- /13- /14- /1599352370478           
ShafaroudIranH I WShafaroud5303/1203/2007/2211/2210137295011800.10
0.50
(3')0.80(3')*0.80(12)300300   

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower / Irrigation / Water Supply

River: Chanxi

Reservoir capacity: 53 m3x106

Construction Dates

Start of Project: 12/85

Start of RCC: 12/85

End of RCC: 08/89

End of Project: 09/89

Specifications

Height: 58 metres

Length: 150 metres

Volume of RCC: 71 m3x103

Total volume: 93 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalReinforced conventional concrete cast after RCC placement
0.30Reinforced conventional concrete cast after RCC placement
Downstream
SlopeType
0.75RCC against precast concrete blocks
Spillway
SlopeType
0.75Reinforced concrete cast against precast units or slip-formed facing elements

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
72
54
Pozzolan (kg/m3)Pozzolan Type
82Low-lime flyash (ASTM Class F)
86 
Longmentan Nº1 completed
Longmentan Nº1 completed

Full Dam Information

Details

Country: Japan

Owner: -

Type: Gravity

Purpose(s): Flood Control / Irrigation / Water Supply

River: Douzan

Reservoir capacity: 53 m3x106

Construction Dates

Start of Project: 02/92

Start of RCC: 02/92

End of RCC: 02/97

End of Project: 03/00

Specifications

Height: 111 metres

Length: 250 metres

Volume of RCC: 355 m3x103

Total volume: 510 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.76Traditional concrete against formwork
Spillway
SlopeType
0.76Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
250750
 1000

Cementitious material

Cement (kg/m3)
84
72
Pozzolan (kg/m3)Pozzolan Type
36Low-lime flyash (ASTM Class F)
48 
Tomisato completed
Tomisato completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Longchuan

Reservoir capacity: 53 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/11

End of Project: -/12

Specifications

Height: 76 metres

Length: 239 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Dengke completed
Dengke completed

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Hydropower

River: Bahe

Reservoir capacity: 53 m3x106

Construction Dates

Start of Project: -/11

Start of RCC: -/11

End of RCC: -/14

End of Project: -/15

Specifications

Height: 99 metres

Length: 352 metres

Volume of RCC: 370 m3x103

Total volume: 478 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Iran

Owner: -

Type: Gravity

Purpose(s): Hydropower / Irrigation / Water Supply

River: Shafaroud

Reservoir capacity: 53 m3x106

Construction Dates

Start of Project: 03/12

Start of RCC: 03/12

End of RCC: 07/22

End of Project: 11/22

Specifications

Height: 101 metres

Length: 372 metres

Volume of RCC: 950 m3x103

Total volume: 1180 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10RCC against formwork (GEVR/GE-RCC)
0.50 
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Shafaroud under construction
Shafaroud under construction

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates