Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
HuatanChinaYa’an Electricity CompanyHYinghe801/9606/9612/9805/99851732402900.20(1)0.80(1)0.80(1)300 -
400
300 -
400
78
74
95
90
(F)
WalaJordanJordan Valley Authority, Ministry of Water and IrrigationGWala901/9910/0004/0204/03523002402600.30(1)0.70(1)*0.70(1)*300300120
100
0
0
(-) -
LeidatanChinaLeidatan CorporationHYingtaoyuangou9403/03- /05- /0606/0784202240340V(3')0.70(3')0.70(1)     
Kotanli II
[A-G]
TurkeyEBD En. Ür. ve Tic. A.S.HKura2010/1305/1404/1507/15752502402470.15(3)0.70(3')*0.70 30030085130(N)

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: China

Owner: Ya’an Electricity Company

Type: Gravity

Purpose(s): Hydropower

River: Yinghe

Reservoir capacity: 8 m3x106

Construction Dates

Start of Project: 01/96

Start of RCC: 01/96

End of RCC: 12/98

End of Project: 05/99

Specifications

Height: 85 metres

Length: 173 metres

Volume of RCC: 240 m3x103

Total volume: 290 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.20Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300  -300  -
400400

Cementitious material

Cement (kg/m3)
78
74
Pozzolan (kg/m3)Pozzolan Type
95Low-lime flyash (ASTM Class F)
90 
Huatan completed
Huatan completed

Full Dam Information

Details

Country: Jordan

Owner: Jordan Valley Authority, Ministry of Water and Irrigation

Type: Gravity

Purpose(s): Groundwater Recharge

River: Wala

Reservoir capacity: 9 m3x106

Construction Dates

Start of Project: 01/99

Start of RCC: 01/99

End of RCC: 04/02

End of Project: 04/03

Specifications

Height: 52 metres

Length: 300 metres

Volume of RCC: 240 m3x103

Total volume: 260 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.30Traditional concrete against formwork
Downstream
SlopeType
0.70Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.70Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
120
100
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
0 
Wala completed
Wala completed

Full Dam Information

Details

Country: China

Owner: Leidatan Corporation

Type: Gravity

Purpose(s): Hydropower

River: Yingtaoyuangou

Reservoir capacity: 94 m3x106

Construction Dates

Start of Project: 03/03

Start of RCC: 03/03

End of RCC: -/06

End of Project: 06/07

Specifications

Height: 84 metres

Length: 202 metres

Volume of RCC: 240 m3x103

Total volume: 340 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.70Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Leidatan under construction
Leidatan under construction

Full Dam Information

Details

Country: Turkey

Owner: EBD En. Ür. ve Tic. A.S.

Type: Arch-Gravity

Purpose(s): Hydropower

River: Kura

Reservoir capacity: 20 m3x106

Construction Dates

Start of Project: 10/13

Start of RCC: 10/13

End of RCC: 04/15

End of Project: 07/15

Specifications

Height: 75 metres

Length: 250 metres

Volume of RCC: 240 m3x103

Total volume: 247 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.15RCC against formwork
Downstream
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.70 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
85
Pozzolan (kg/m3)Pozzolan Type
130Natural pozzolan (ASTM Class N)
  
Kotanli II completed
Kotanli II completed

 