3 de Febrero (formerly El Chaparral)

< Back to search results

Download PDF data sheet
Photo coming soon

Particulars

Owner: Comisión Ejecutiva Hidroeléctrica del Rio Lempa (CEL)

Designer: Intertechne Consultores Associados

Contractor: Astaldi (contract terminated) and UDP/Cartellone (Argentina)/Holcim JV

Statistics

Type: Hardfill

Purpose(s): Hydropower

Reservoir capacity: unknown

Height: 88 metres

Length: 324 metres

Volume of RCC: 375 m3x103

Total volume: 450 m3x103

Construction Dates

Start of Project: /09 ( 2009)

Start of RCC: /18 ( 2018)

End of RCC: /20 ( 2020)

End of Project: 10/23 (October 2023)

Country: El Salvador

River: Torola

DMS Co-ordinates: 13˚51'46.94"N, 88˚21'3"W

DD Co-ordinates: 13.863039, -88.35083

Facings

Upstream

SlopeType
0.20RCC against precast concrete panels (GEVR/GE-RCC)

Downstream

SlopeType
0.80RCC against precast concrete panels (GEVR/GE-RCC)

Spillway

SlopeType
0.80RCC against precast concrete panels (GEVR/GE-RCC)

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
94
Pozzolan (kg/m3)Pozzolan Type
63Natural pozzolan (ASTM Class N)