Barra das Águas
Download PDF data sheet
Barra das Águas completed

Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 11 m3x106
Height: 34 metres
Length: 235 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/17 (— 2017)
Start of RCC: 04/18 (April 2018)
End of RCC: 07/19 (July 2019)
End of Project: —/20 (— 2020)
Country: Brazil
River: Irani
DMS Co-ordinates: 26˚57'17.05"S, 52˚18'3.17"W
DD Co-ordinates: -26.954737, -52.30088
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
