Batang Toru

< Back to search results

Download PDF data sheet
Batang Toru under construction
Batang Toru under construction

Particulars

Owner: PT. North Sumatra Hydro Energy

Designer: BIDHI

Contractor: SinoHydro Co. Ltd. (Construction Bureau Nº*)

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 18 m3x106

Height: 79 metres

Length: 137 metres

Volume of RCC: unknown

Total volume: 500 m3x103

Construction Dates

Start of Project: 10/21 (October 2021)

Start of RCC: 07/23 (July 2023)

End of RCC: 03/25 (March 2025)

End of Project: /26 ( 2026)

Country: Indonesia

River: Batang Toru

DMS Co-ordinates: 1˚37'27.41"N, 99˚10'35.06"E

DD Co-ordinates: 1.624281, 99.176407