Boa Fé
Download PDF data sheet
Boa Fé completed

Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 5 m3x106
Height: 26 metres
Length: 198 metres
Volume of RCC: 32 m3x103
Total volume: 58 m3x103
Construction Dates
Start of Project: —/10 (— 2010)
Start of RCC: —/10 (— 2010)
End of RCC: —/11 (— 2011)
End of Project: —/11 (— 2011)
Country: Brazil
River: Carreiro
DMS Co-ordinates: 28˚45'8.69"S, 51˚50'37.92"W
DD Co-ordinates: -28.752415, -51.843868
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
