Bouljir
Download PDF data sheet
Photo coming soon

Particulars
Owner: AREP (Regional Project Execution Agency)
Designer: Novec
Contractor: STAM (Société des travaux agricoles du Maroc)
Statistics
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
Reservoir capacity: 12 m3x106
Height: 25 metres
Length: 416 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: 07/24 (July 2024)
Start of RCC: —/25 (— 2025)
End of RCC: —/26 (— 2026)
End of Project: —/27 (— 2027)
Country: Morocco
River: Boujir
DMS Co-ordinates: 28˚43'24.08"N, 9˚27'44.9"W
DD Co-ordinates: 28.723356, -9.462472
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 |
Downstream
| Slope | Type |
|---|---|
| 0.80 |
Spillway
| Slope | Type |
|---|---|
| 0.80 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|