Cachoeirão (Henrique Nunes Coutinho)
Download PDF data sheet
Cachoeirão (Henrique Nunes Coutinho) completed

Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: unknown
Height: 23 metres
Length: 90 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/07 (— 2007)
Start of RCC: —/07 (— 2007)
End of RCC: —/08 (— 2008)
End of Project: —/08 (— 2008)
Country: Brazil
River: Manhuaçu
DMS Co-ordinates: 19˚26'12.65"S, 41˚36'51.7"W
DD Co-ordinates: -19.436848, -41.614361
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
