Camlica III

Download PDF data sheet
Camlica III under construction
Camlica III under construction

Particulars

Owner: Akfen Energy

Designer: YolsuEngineering Services Inc.

Contractor: Akfen Construction Industry and Trade Inc.

Statistics

Type: Hardfill

Purpose(s): Flood Control / Hydropower

Reservoir capacity: 1 m3x106

Height: 52 metres

Length: 186 metres

Volume of RCC: 160 m3x103

Total volume: 182 m3x103

Construction Dates

Start of Project: 04/08 (April 2008)

Start of RCC: 04/10 (April 2010)

End of RCC: 12/10 (December 2010)

End of Project: 04/11 (April 2011)

Country: Turkey

River: Zamanti

DMS Co-ordinates: 37˚54'3"N, 35˚30'14"E

DD Co-ordinates: 37.900833, 35.503887

Facings

Upstream

SlopeType
0.70RCC against precast concrete panels

Downstream

SlopeType
0.70RCC against formwork  [stepped face]

Spillway

SlopeType
0.70Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
88
Pozzolan (kg/m3)Pozzolan Type
37Low-lime flyash (ASTM Class F)