Çamlica III
Download PDF data sheet
Photo coming soon

Particulars
Owner: Akfen Energy
Designer: YolsuEngineering Services Inc.
Contractor: Akfen Construction Industry and Trade Inc.
Statistics
Type: Hardfill
Purpose(s): Flood Control / Hydropower
Reservoir capacity: 1 m3x106
Height: 52 metres
Length: 186 metres
Volume of RCC: 160 m3x103
Total volume: 182 m3x103
Construction Dates
Start of Project: 04/08 (April 2008)
Start of RCC: 04/10 (April 2010)
End of RCC: 12/10 (December 2010)
End of Project: 04/11 (April 2011)
Country: Turkey
River: Zamanti
DMS Co-ordinates: 37˚53'16.58"N, 35˚30'23.14"E
DD Co-ordinates: 37.887939, 35.506428
Facings
Upstream
| Slope | Type |
|---|---|
| 0.70 | RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 88 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 37 | Low-lime flyash (ASTM Class F) |
