Capulin San Pablo
Download PDF data sheet
Capulin San Pablo under construction

Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 7 m3x106
Height: 49 metres
Length: unknown
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/15 (— 2015)
Start of RCC: —/16 (— 2016)
End of RCC: —/19 (— 2019)
End of Project: —/20 (— 2020)
Country: Costa Rica
River: Tárcoles
DMS Co-ordinates: 9˚55'21.01"N, 84˚26'45.72"W
DD Co-ordinates: 9.922503, -84.44603