Dagu
Download PDF data sheet
Dagu completed

Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 55 m3x106
Height: 118 metres
Length: 385 metres
Volume of RCC: 937 m3x103
Total volume: 1442 m3x103
Construction Dates
Start of Project: —/16 (— 2016)
Start of RCC: 03/19 (March 2019)
End of RCC: 04/21 (April 2021)
End of Project: —/23 (— 2023)
Country: China
River: Yaluzangbu (Brahmaputra)
DMS Co-ordinates: 29˚15'35.28"N, 92˚24'42.84"E
DD Co-ordinates: 29.2598, 92.411903
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 93 |
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 93 | |
| 100 |
