SEARCHING
... please wait

Don Sahong

< Back to search results

Download PDF data sheet
Photo coming soon

Particulars

Owner: Don Sahong Power Company (Mega First Corporation Berhad and Électricité du Laos)

Designer: Kunming Engineering Co. Ltd.

Contractor: SinoHydro Co. Ltd. (Construction Bureaux Nº10 and Nº15)

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 24 m3x106

Height: 26 metres

Length: 6800 metres

Volume of RCC: 566 m3x103

Total volume: 609 m3x103

Construction Dates

Start of Project: 10/15 (October 2015)

Start of RCC: /16 ( 2016)

End of RCC: /18 ( 2018)

End of Project: 12/19 (December 2019)

Country: Laos

River: Mekong

DMS Co-ordinates: 13˚56'54.82"N, 105˚57'29.98"E

DD Co-ordinates: 13.948561, 105.958328

Facings

Upstream

SlopeType
0.30Traditional concrete against formwork

Downstream

SlopeType
0.75Traditional concrete against formwork

Spillway

SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3002400

Cementitious material

Cement (kg/m3)
55
Pozzolan (kg/m3)Pozzolan Type
103Low-lime flyash (ASTM Class F)