Gaosheng
Download PDF data sheet
Gaosheng on Google Earth

Particulars
Owner: Yalong River Hydropower Development Co. Ltd.
Designer: unknown
Contractor: SinoHydro Construction Bureau Nº8 Co. Ltd.
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 100 m3x106
Height: 121 metres
Length: unknown
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/16 (— 2016)
Start of RCC: —/17 (— 2017)
End of RCC: —/19 (— 2019)
End of Project: —/20 (— 2020)
Country: China
River: Hongdu
DMS Co-ordinates: 28˚45'0.13"N, 108˚7'21.52"E
DD Co-ordinates: 28.750036, 108.122643
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
