SEARCHING
... please wait

Garibaldi

Download PDF data sheet
Garibaldi completed
Garibaldi completed

Particulars

Owner: CTG Brasil (previously Triunfo Engergia)

Designer: Intertechne Consultores Associasdos

Contractor: unknown

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: unknown

Height: 40 metres

Length: 490 metres

Volume of RCC: 264 m3x103

Total volume: 382 m3x103

Construction Dates

Start of Project: /10 ( 2010)

Start of RCC: /11 ( 2011)

End of RCC: /12 ( 2012)

End of Project: 09/13 (September 2013)

Country: Brazil

River: Canoas

DMS Co-ordinates: 27˚37'32.02"S, 50˚59'4.52"W

DD Co-ordinates: -27.625561, -50.984589

Facings

Upstream

SlopeType
  

Downstream

SlopeType
  

Spillway

SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type