Gulpur
Download PDF data sheet
Photo coming soon

Particulars
Owner: WAPDA (Water and Power Development Authority) and MIRA Power Ltd. (a subsidiary of KOSEP)
Designer: unknown
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 22 m3x106
Height: 35 metres
Length: 238 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: 09/14 (September 2014)
Start of RCC: —/16 (— 2016)
End of RCC: —/18 (— 2018)
End of Project: 02/20 (February 2020)
Country: Pakistan
River: Poonch
DMS Co-ordinates: 33˚27'20.44"N, 73˚51'57.3"E
DD Co-ordinates: 33.455677, 73.865921
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
