SEARCHING
... please wait

Guxian (GuhXiahn)

Download PDF data sheet
Guxian (GuhXiahn) on Google Earth
Guxian (GuhXiahn) on Google Earth

Particulars

Owner: Yellow River Conservancy Commission

Designer: Yellow River Engineering Consulting Co., Ltd.

Contractor: 11th Construction Bureau (now SinoHydro)

Statistics

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation

Reservoir capacity: 1175 m3x106

Height: 125 metres

Length: 315 metres

Volume of RCC: unknown

Total volume: unknown

Construction Dates

Start of Project: /78 ( 1978)

Start of RCC: /89 ( 1989)

End of RCC: /92 ( 1992)

End of Project: /93 ( 1993)

Country: China

River: Luo

DMS Co-ordinates: 34˚14'26.07"N, 111˚16'40.5"E

DD Co-ordinates: 34.240574, 111.277916

Facings

Upstream

SlopeType
  

Downstream

SlopeType
  

Spillway

SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type