Houay LaNge
Download PDF data sheet
Houay LaNge completed

Particulars
Designer: PowerChina Sinohydro Construction Bureau Nº10 (EPC)
Contractor: PowerChina Sinohydro Construction Bureau Nº10 (EPC)
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 14 m3x106
Height: 59 metres
Length: 174 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: 02/18 (February 2018)
Start of RCC: —/20 (— 2020)
End of RCC: —/22 (— 2022)
End of Project: 05/23 (May 2023)
Country: Laos
River: Houaylange
DMS Co-ordinates: 15˚48'16.2"N, 107˚8'13.2"E
DD Co-ordinates: 15.8045, 107.137001
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|