Huanglinxia
Download PDF data sheet
Photo coming soon

Particulars
Owner: unknown
Designer: unknown
Contractor: SinoHydro Construction Bureau Nº12 Co. Ltd.
Statistics
Type: Gravity
Purpose(s): Hydropower / Water Supply
Reservoir capacity: 221 m3x106
Height: 70 metres
Length: 349 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: 10/18 (October 2018)
Start of RCC: —/20 (— 2020)
End of RCC: 11/22 (November 2022)
End of Project: 07/23 (July 2023)
Country: China
River: Hanshui
DMS Co-ordinates: 33˚07'23.79"N, 107˚56'18.75"E
DD Co-ordinates: 33.123276, 107.938545