João Borges
Download PDF data sheet
João Borges completed

Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 23 m3x106
Height: 29 metres
Length: 170 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/12 (— 2012)
Start of RCC: —/12 (— 2012)
End of RCC: —/13 (— 2013)
End of Project: 11/13 (November 2013)
Country: Brazil
River: Caveiras
DMS Co-ordinates: 27˚43'1.82"S, 50˚39'27.38"W
DD Co-ordinates: -27.717173, -50.657604
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
