Kargi

Download PDF data sheet
Photo coming soon

Particulars

Owner: Limak Energy

Designer: unknown

Contractor: unknown

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: unknown

Height: 95 metres

Length: 270 metres

Volume of RCC: 535 m3x103

Total volume: unknown

Construction Dates

Start of Project: /11 ( 2011)

Start of RCC: /15 ( 2015)

End of RCC: 12/16 (December 2016)

End of Project: 06/17 (June 2017)

Country: Turkey

River: Sakarya

DMS Co-ordinates: unknown

DD Co-ordinates: unknown