Katende
Download PDF data sheet
Katende on Google Earth

Particulars
Owner: SNEL (Société Nationale d'Électricité)
Designer: WAPCOS
Contractor: Consortium of BHEL and AIL, India
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: unknown
Height: 16 metres
Length: unknown
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: 08/11 (August 2011)
Start of RCC: —/15 (— 2015)
End of RCC: —/25 (— 2025)
End of Project: —/27 (— 2027)
Country: DR Congo
River: Lulua
DMS Co-ordinates: 6˚20'43.06"S, 22˚27'9.65"E
DD Co-ordinates: -6.345294, 22.452681
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
