Lianhuatai
Download PDF data sheet
Lianhuatai completed

Particulars
Owner: Guodian Shaanxi Hydropower Development Co.
Designer: Northwest Institute of Investigation and Design of Hydropower, Xi'an, Shaanxi Province
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 95 m3x106
Height: 70 metres
Length: 221 metres
Volume of RCC: unknown
Total volume: 221 m3x103
Construction Dates
Start of Project: 02/09 (February 2009)
Start of RCC: —/10 (— 2010)
End of RCC: —/11 (— 2011)
End of Project: —/11 (— 2011)
Country: China
River: Dan
DMS Co-ordinates: 33˚20'19.97"N, 110˚52'23.09"E
DD Co-ordinates: 33.338882, 110.873077
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
