SEARCHING
... please wait

Lom Pangar

< Back to search results

Download PDF data sheet
Lom Pangar completed
Lom Pangar completed

Particulars

Owner: EDC (Electricity Development Corporation)

Designer: Tractebel/ISL

Contractor: CWC (China International Water and Electric Corporation)

Statistics

Type: Gravity

Purpose(s): Flood Control / Hydropower

Reservoir capacity: 6000 m3x106

Height: 46 metres

Length: 185 metres

Volume of RCC: 175 m3x103

Total volume: 290 m3x103

Construction Dates

Start of Project: /19 ( 2019)

Start of RCC: 02/21 (February 2021)

End of RCC: 03/23 (March 2023)

End of Project: 09/24 (September 2024)

Country: Cameroon

River: Lom

DMS Co-ordinates: 5˚22'56.6"N, 13˚30'10.34"E

DD Co-ordinates: 5.382389, 13.502871

Facings

Upstream

SlopeType
VerticalTraditional concrete against formwork

Downstream

SlopeType
0.85Traditional concrete against formwork

Spillway

SlopeType
0.85Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
100
Pozzolan (kg/m3)Pozzolan Type
100Low-lime flyash (ASTM Class F)