Ludesa
Download PDF data sheet
Ludesa completed

Statistics
Type: Hardfill
Purpose(s): Hydropower
Reservoir capacity: 142 m3x106
Height: 25 metres
Length: 300 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/06 (— 2006)
Start of RCC: —/06 (— 2006)
End of RCC: —/07 (— 2007)
End of Project: 04/07 (April 2007)
Country: Brazil
River: Chapecó
DMS Co-ordinates: 26˚34'41.15"S, 52˚29'46.76"W
DD Co-ordinates: -26.578096, -52.496323
Facings
Upstream
| Slope | Type |
|---|---|
| 1.50 |
Downstream
| Slope | Type |
|---|---|
| 1.50 |
Spillway
| Slope | Type |
|---|---|
| 0.75 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
