Manavgat Yeniköy Yerköprü
Download PDF data sheet
Photo coming soon

Particulars
Owner: DSI - State Hydraulic Works
Designer: unknown
Contractor: Gölsu Madencilik İnsaat Ticaret ve Sanayi Anonim Şti.
Statistics
Type: Gravity
Purpose(s): Irrigation
Reservoir capacity: 1 m3x106
Height: 35 metres
Length: 193 metres
Volume of RCC: unknown
Total volume: 60 m3x103
Construction Dates
Start of Project: 09/23 (September 2023)
Start of RCC: —/25 (— 2025)
End of RCC: —/26 (— 2026)
End of Project: —/26 (— 2026)
Country: Turkey
River: Hamam Suyu
DMS Co-ordinates: 36˚54'35.66"N, 31˚22'4.34"E
DD Co-ordinates: 36.909904, 31.36787
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
