Mellègue Amont
Download PDF data sheet
Photo coming soon

Statistics
Type: Hardfill
Purpose(s): Hydropower / Irrigation
Reservoir capacity: 195 m3x106
Height: 68 metres
Length: 430 metres
Volume of RCC: 500 m3x103
Total volume: 560 m3x103
Construction Dates
Start of Project: —/16 (— 2016)
Start of RCC: —/17 (— 2017)
End of RCC: —/19 (— 2019)
End of Project: —/20 (— 2020)
Country: Tunisia
River: Oued Mellègue
DMS Co-ordinates: 36˚14'41"N, 08˚37'22"E
DD Co-ordinates: 36.24472, 8.622778
Facings
Upstream
| Slope | Type |
|---|---|
| 0.60 |
Downstream
| Slope | Type |
|---|---|
| 0.60 |
Spillway
| Slope | Type |
|---|---|
| 0.60 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |
