SEARCHING
... please wait

Nam Theun 1

Download PDF data sheet
Photo coming soon

Particulars

Owner: Nam Theun 1 Power Company

Designer: Pöyry Energy Ltd.

Contractor: CMC Ravenna, Song Da Corporation J.V.

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 2772 m3x106

Height: 177 metres

Length: unknown

Volume of RCC: 3900 m3x103

Total volume: 4400 m3x103

Construction Dates

Start of Project: 08/15 (August 2015)

Start of RCC: 03/17 (March 2017)

End of RCC: 05/20 (May 2020)

End of Project: 01/21 (January 2021)

Country: Laos

River: Nam Kading, aka Nam Theun

DMS Co-ordinates: 18˚21'18"N, 104˚08'50"E

DD Co-ordinates: 18.355000, 104.147224

Facings

Upstream

SlopeType
  

Downstream

SlopeType
  

Spillway

SlopeType
  

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)